My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 02/24/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:53:52 PM
Creation date
2/19/2009 1:01:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Project administration 5~/0 <br />• Bonding and legal 2% <br />• Inspection and tasting Sp~/a <br />• Contingencies. 10°/u <br />The above project costs do not include the cost of paving existing unpaved driveways. <br />Such driveways are private property and not a portion of the public street, Each unpaved <br />driveway shall have its bituminous apron measured by area and will bebilled-additionally <br />to the property, The estimated cast For driveway paving is estimated to be $3,00 per <br />square foot.. <br />FINANCING <br />The total project costs consist of the construction costs and project overhead costs which <br />are detailed in Appendix B; Funding sources for this project include City Municipal State <br />Aid funds (VISA), storm water utility funds, and special assessment to benefitted <br />properties, <br />The casts associated with. the replacement of the road shall be funded with MSA monies. <br />The cast associated with concrete curb and gutter will be funded 2S% from the storm <br />water utility with the remaining 7S°..t4 frot~n-MSA funds, These costs also include <br />associated work elements including irrigation repair, and landscaping restoration costs. <br />The ston~i sewer repairs and extensions will be funded entirely from the storm water <br />utility. The sidewalk will be funded through MSA funds should the Council decide to <br />award the alternate project, Property owners will contribute the equivalent cost of a <br />bitwninous overlay on the road which. is estimated to cost $1,700 per unit at unit prices <br />anticipated during the 2009 construction season. <br />Based upon the above distribution the total project cost will be funded as follows; <br />MSA / Storm Water- Property <br />Total City Utility ~Dwners <br />Basic Project Cost $ 1,233,539 $ 925,953 $ 193,686 $ 11,3,900 <br />' Alternate Project Cost $ 1,591,233 $1,283,647 $ 193,686 $ 113,900 <br />The project will have a final tabulation mach on actual praject casts, A public hearing <br />will beheld iderttifying tho actual casts to be recovered by special assessment which tzaay <br />change depending on the actual bituir~inous overlay cost e;+~perienced during the 2009 <br />construction season. Property owners. would have the option of paying the full cost of the <br />assessment without interest at the conclusion of the praject or could elect tb have this <br />assessment collected annually with. their tax payment. Property owners electing to have <br />the praject cast specially assessed shall have their cost reported to Anoka County and <br />collected over a period of up to ten years with interest at a rate of two percent (2%) above <br />the U.S. Treasury rate at the time. of the special assessment hearing. At an estimated <br />-114- ...~,~..~...~..,._.,.~....~...,.w._.~,....,~._,..~....,...,_.~,....~..~ Pale 4 .~.,,.~_„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.