Laserfiche WebLink
CASE # <br />2009 ANNUAL STREET MAINTENANCE PROGRAM <br />By: Steven J. Jankowski, City Engineer <br />Background: <br />At tonight's meeting, public hearings will be held on Improvement Projects #09-02 through #09- <br />14, which along with IP 09 -01 comprise the 2009 Annual Street Maintenance Program. The City <br />has a considerable investment in the 167 miles of bituminous street for which it is responsible. <br />The City has established the practice of applying timely preventative maintenance to the <br />pavements to preserve this investment. Although budget constraints and pavement conditions <br />may alter the actual schedule, the table below presents an idealized timetable for pavement <br />maintenance. <br />Typical Bituminous Street Maintenance Cycle <br />Year <br />Action <br />0 <br />Construction <br />5 <br />Sealcoat <br />12 <br />Sealcoat <br />19 <br />Overlay <br />24 <br />Sealcoat <br />The City has had an annual maintenance program since 1981. Through the 1990 program it was <br />the City's policy to assess the entire cost of the maintenance programs. In 1991 the City changed <br />the policy such that 50 percent of the total project cost was assessed, with the City general fund <br />financing the remaining half. This is the second year of a seven year program to phase out the <br />assessment for sealcoating of streets. This year the assessment for sealcoats will be 36% of the <br />total project cost. The assessments for overlays will remain at 50% of the total project cost. <br />The 2009 program consists of 14 individual projects addressing the maintenance needs on 16.67 <br />miles of City streets. Projects 09 -01 through 09 -10 which covers 15.02 miles of City streets, will <br />receive a sealcoating preceded by sealing of cracks having widths which exceed one - quarter <br />inch. The 2009 program includes sealcoating of 1.63 miles of MSA streets and is included in <br />projects 09 -10. Projects 09 -11 and 09 -12 which involve 1.74 miles of street, will receive a one <br />and one -half inch bituminous overlay of the existing bituminous pavement following the repair <br />of failed areas by .the Public Works Department. <br />The 2009 program is proposed to be financed through a number of funding sources including <br />MSA funds, developer escrows, special assessments, and City general funds. <br />A summary of the anticipated funding is presented below. <br />Developer Escrows <br />$ 33,640 <br />MSA <br />$ 190,700 <br />Overlay Assessments <br />$ 107,717 <br />Seal Assessments <br />$ 127,082 <br />City General Fund <br />$ 376,964 <br />TOTAL <br />$ 836,103 <br />-153- <br />