Laserfiche WebLink
drainage and utility easements along the road for snow storage. The remaining 50% of <br />the street improvements will be financed with City of Ramsey general funds revenues, <br />Based upon the above distribution the total project cost will be funded as follows; <br />The number of shares assessed and dollar value of the assessment are listed for each of <br />the 11 benefited properties in Appendix C. Since the three properties having double <br />frontage with Waco Street were assessed a full share when Waco Street was graded and <br />paved in 1993, they will be assessed one half share. The corner lot on 179th Lane having <br />driveway access onto Ute Street would be charged a full share and the corner lot on <br />179th Lane having driveway access onto 179 Lane, Street would be charged a half share, <br />This is consistent with past City policy for assessing corner lots. <br />The project will have a final tabulation made on actual project casts consistent with the <br />methodology described in this report, A public; hearing will be held identifying the actual <br />coasts to be recovered by special assessment. Property owner would have the option of <br />paying the full coast of the assessment without interest at the conclusion of the project or <br />could elect to have this assessment collected annually with their tax payment, Property <br />owners electing to have the project cost specially assessed shall have their cost reported <br />to Anoka.County and collected over a period of up to ten years with interest at a rate of <br />two percent (2 %) above the U.S. Treasury rate at the time of the special assessment <br />hearing. At an estimated interest rate of 6.8 '%, full share annual payments would range <br />from $920 to $585for the basic project and from $1108 to $704 for the alternate project <br />over the ten year period. <br />PROJECT SCHEDULE <br />This project is anticipated to proceed under the regulations of Chapter 4 of City Code cold <br />State Statutes 429 wluch regulate special assessment public improvement projects, A <br />schedule for the progress of this project is anticipated as follows; <br />■ March 10, 2009 City Council ratifies PW Committee recommendation.; <br />accepts feasibility study and orders the advertisement <br />for a public hearing <br />* April 14, 2009 Hold public hearing <br />■ May 26, 2009 City Council orders project and directs preparation of <br />plans and specifications. <br />■ June 23, 2009 Council receives plans and specifications and orders <br />advertisement for bids <br />—5— —277— <br />Basic Project <br />Alternate Project <br />City General Fund <br />$ <br />49,323 <br />$ <br />59,391 <br />Property Assessments <br />$ <br />49,323 <br />$ <br />59,391 <br />Storm Water Utility <br />$ <br />90,064 <br />$ <br />90,064 <br />TOTAL <br />$ <br />188,710 <br />$ <br />208,846 <br />Per share assessment <br />$ <br />5,480 <br />$ <br />6,599 <br />The number of shares assessed and dollar value of the assessment are listed for each of <br />the 11 benefited properties in Appendix C. Since the three properties having double <br />frontage with Waco Street were assessed a full share when Waco Street was graded and <br />paved in 1993, they will be assessed one half share. The corner lot on 179th Lane having <br />driveway access onto Ute Street would be charged a full share and the corner lot on <br />179th Lane having driveway access onto 179 Lane, Street would be charged a half share, <br />This is consistent with past City policy for assessing corner lots. <br />The project will have a final tabulation made on actual project casts consistent with the <br />methodology described in this report, A public; hearing will be held identifying the actual <br />coasts to be recovered by special assessment. Property owner would have the option of <br />paying the full coast of the assessment without interest at the conclusion of the project or <br />could elect to have this assessment collected annually with their tax payment, Property <br />owners electing to have the project cost specially assessed shall have their cost reported <br />to Anoka.County and collected over a period of up to ten years with interest at a rate of <br />two percent (2 %) above the U.S. Treasury rate at the time of the special assessment <br />hearing. At an estimated interest rate of 6.8 '%, full share annual payments would range <br />from $920 to $585for the basic project and from $1108 to $704 for the alternate project <br />over the ten year period. <br />PROJECT SCHEDULE <br />This project is anticipated to proceed under the regulations of Chapter 4 of City Code cold <br />State Statutes 429 wluch regulate special assessment public improvement projects, A <br />schedule for the progress of this project is anticipated as follows; <br />■ March 10, 2009 City Council ratifies PW Committee recommendation.; <br />accepts feasibility study and orders the advertisement <br />for a public hearing <br />* April 14, 2009 Hold public hearing <br />■ May 26, 2009 City Council orders project and directs preparation of <br />plans and specifications. <br />■ June 23, 2009 Council receives plans and specifications and orders <br />advertisement for bids <br />—5— —277— <br />