Laserfiche WebLink
PROJECT BG'T; <br />Detailed project estimates are included' Attachment B: Ftaiir wing is an abbreviated statement <br />of project specifications: <br />Site *1 N parcel at Su+ood O►ive and White Street <br />22 <br />Land excavating, grading, contouring and 85 yards clean fill $5,000 <br />Landscape materials; plants, trees, shrubs, including install $4,000 <br />Wetland enhancements from Prairie Restorations, Inc. $3,500 <br />30" x 30" boulder from Hedberg Aggregates $1,000 <br />Commercial to benches 2 qty. and waste <br />to be 4antracteci air pu chased directly through <br />Site #2 <br />Land grading, contouring and 300 yards clan fill <br />Landscape materials; plants, trees, shrubs, including install <br />Wetland enhancements from Prairie Restorations, Inc. <br />30" x 30" boulder ftom Hedberg Aggregates <br />Co <br />or: of C mty Road 5 and Su +ood Dri <br />hes — 2 ccty and wastes <br />Project Proposal 4 <br />Pre cte ci C t <br />Pmjected Cost <br />$12,500 <br />$5,000 <br />$5,200 <br />$1,000 <br />ugh <br />