My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 04/14/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:57:30 PM
Creation date
4/9/2009 12:53:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />On May 27, 2008 a petition was received by City Council requesting the bituminous <br />paving of Ute Street from 179 Lane to a distance approximately 800 feet to the north <br />(terminating at the dead end turn around). A copy of this petition is contained in <br />Appendix A. City council directed the preparation of this feasibility study in response to <br />this petition. A draft feasibility study was prepared and discussed with the residents at an <br />informational meeting held on September 10, 2008 and again with the Public Works <br />Committee on September) 6, 2008. On January 24, 2009 a meeting with residents was <br />held to discuss issues of concern contained in the initial feasibility study. Results of this <br />meeting were presented to the Public Works Committee on February 17, 2009 which then <br />recommended modifications in this study which were ratified by the City Council on <br />March 10, 2009. <br />The project area and benefitted properties is illustrated in Figure 1. This report will <br />identify the existing street condition along with the proposed improvements and the <br />associated costs and financing, including the cost to each benefitted property. Finally this <br />report will provide a possible project timeline. <br />EXISTING CONDITIONS <br />The surface of the existing roadway is primarily native sand material with some <br />aggregates that have been added to portions of the roadway. The roadway width is 16 to <br />18 feet wide. The street terminates in a dead end approximately 800 feet north of 179 <br />Lane (CR27) with an irregularly shaped bulb which is roughly 35 to 40 feet at its widest <br />dimension. This bulb functions very poorly as a turn around for large emergency vehicles <br />and city plows and is even problematic for passenger vehicles to turn around without <br />entering a private driveway. <br />The project area is not platted and there had been uncertainty over the legal right of way <br />available. The City has had ownership and encumbrance reports prepared for all eleven <br />properties involved. It has been determined that the City has no rights other than <br />prescriptive rights to the right of way it has been maintaining. This is roughly a 16 to 18 <br />feet roadway width which meanders a distance of approximately four feet along the <br />roadway from south to north. The City has also been maintaining an irregularly shaped <br />turn around bulb at the north end of the street. <br />The northern 200 feet of the roadway drains northward into the City ofNowthen. The <br />southern 650 feet of the roadway drains easterly onto the adjoining property and toward <br />Rogers Lake. Because of the relatively steep grade toward the lake, there is little ponding <br />except for the area at the south end of the project area. There are few driveway culverts. <br />A total of 11 properties have frontage along Ute Street. Three of these properties have <br />double frontage with Waco Street to the west. Two of these three properties have their <br />main frontage and address assignment on Waco Street. All three of these properties were <br />
The URL can be used to link to this page
Your browser does not support the video tag.