Laserfiche WebLink
<br />14"0 !mp.'emef.lt p.'an fo.'" comm/,/f.lfaltjf.lg bette.~ with rcsfGf.ef-lts du.~fAfJ the p!f1AAfng fo.~ the street <br />ma,ll'ltcflDI'ICC prGfJrG1I'I'I. <br />15. fA fJrcfJerat,loA for the C-emp."chcASNe p/Gl'Il:Jpeate, ~omfJ/ete the I:JfJoot-c of the Sl:Jrface Water <br />MOFwgemcAt P.'DA. <br />16. Request NCDA & ACRRA to collaboratively fund final design for Ramsey Rail Station. <br />17. Amend JPA with Anoka County for regional roadways around RTC. <br />18. Apply for whistle free zone through Ramsey. <br />19. . Explore options for alternative road construction financing (street improvement district, etc.) <br />20. Develop sidewalk/trail policy. <br /> <br />Streets <br /> <br />1. Continue storm water inspection system and prioritize corrections asnecessary. <br />2. Continue street maintenance performance evaluation program for seal coating and overlay <br />projects utilizing the street rating program with Engineering and PW staff. <br />3. Final upgrades to Public Works metal building (floor drains). <br />4. Formalize policy for private streets/walk/trail clearing. <br />5. Prioritize/document walk and trail maintenance service including hydrant clearing. <br />6. Continue educating residents on plowing process and staking policy (On-going). <br />7. Contiriue OSHA/MNDOT training in equipment operation (On-going). <br /> <br />Utilities <br /> <br />1. Continue efforts to assure accurate water billing. <br />2. Create a zone map for exercising water utility valves in preparation of dividing the task <br />seasonally. <br />3. Communicate maintenance events to public in advance (Website, Cable TV, etc.) (On-going). <br />4. License appropriate staff in operation of sanitary sewage disposal systems (On-going). <br />5. RcscJrch Implement increased security at water supply stations. <br />6. Successfully complete 2nd year of water meter replacement program. <br />7. Train to fully utilize the newly acquired jetter/vac truck. <br />8. Clean 1/3 of our sanitary system annually. <br />9. Televise 1/10 of our sanitary system annually. <br /> <br />Parks <br /> <br />1. Develop public education on park and trail system through flyers and website. (On-going) <br />2. Complete Master Trail Plan after intra-agemcy review (2007). <br />3. Implement 2008-9Parks Capital Improvement Plan (annual revision). <br />4. Complete design and construction of new park building and playground at Elm crest Park. <br />5. Begin process of planning for additional community park north of Trott Brook. <br />6. Complete construction of lions pJrk building development. <br />7. Begin planning for the creation of a Parks and Recreation Department. <br />8. Continue to identify opportunities to provide cost effective solutions to trail system and tree <br />transplantation with the use of our newly acquired paver and tree spade (On-going). <br />9. Begin researching funding opportunities for regional trail connections. <br /> <br />Page 9 of 12 . <br /> <br />Key: New plans are indicated with italics text. <br />Completed plans arc iAdicated .....ith strikethrough te)(t. <br />On going plans are indicated by normal text. <br /> <br />-228-- <br />