My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/09/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 06/09/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:00:15 PM
Creation date
6/4/2009 2:16:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/09/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT 1A <br />Materials Information <br />The site is divided into four geographic zones: riverbank, old field, mowed area, <br />and pond. Each zone is addressed below, in terms of planting and seeding and <br />other materials requirements. See the table below for details. <br />Cedar Revetment Material Cost Qty Total Material <br />cedar trees - cut and prep 15 120 1800 <br />duckbills ("88's" = 1/4") 12.7 240 3048 <br />galvanized cable (1 x 19 strand core) (1/8") (500' <br />spool) 136 4 544 <br />forged wire rope clip (2/tie) (1/4" = 4DV35) 0.4 480 192 <br />labor (1 five person crew five days - revetment <br />installation) 0 <br />Cedar Revetment Subtotal 5584 <br />Riparian Forest Buffer - Riverbank Material Cost Qty Total Material <br />Herbicide for woody veg. control (4 qts) 10 4 40 <br />Live stakes (shrub willow) (2000 ft2) (space 4 x 2) 2.5 250 625 <br />plugs (2 acres along south side of trail; scattered <br />and grouped - 100 flats of 50) 38 44 1672 <br />Shrubs (scattered) ($27/25 bare root) 27 10 270 <br />Contingency <br />Labor (grape vine/buckthorn/Tartarian honeysuckle <br />cutting and herbicide) 0 <br />Labor (plantings - live stakes & shrubs) 0 <br />Labor (planting - plugs) 0 <br />Riparian Forest Buffer - Riverbank Subtotal 2607 <br />Riparian Forest Buffer - Pond Material Cost Qty Total Material <br />herbicide (for spot spray) (1/20 or 1.5qt) 10 2.5 25 <br />cover crop (for bare spots) 50 2 100 <br />Tall/wet native grass seed mix for 1/2 acre (for <br />hand broadcast, in bare spots) 40 5 200 <br />Labor (wood veg management - cut and stump <br />grinding) 0 <br />Equipment (stump grinder) 150 20 3000 <br />Riparian Forest Buffer - Pond Subtotal 3325 <br />Restoration of Rare or Declining Habitats - <br />Savanna <br />Old Field Material Cost Qty Total Material <br />Herbicide (spot spray 13 acres) (19.5qt of <br />Roundup) 10 20 200 <br />Savanna grass seed mix (for 13 acres) 40 130 5200 <br />Savanna wildflower seed mix (for 13 acres) (from <br />PRI) 208 6.5 1352 <br />Labor (tree removal and stump grinding) 0 <br /> <br />Great River Greening <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.