Laserfiche WebLink
<br />ATTACHMENT 5 <br />PROPOSED DIVISION OF GRANT MONIES AND IN-KIND, DETAILED <br />BREAKDOWN <br /> <br />Detailed Breakdown of Proposed Use of BWSR Native Buffer Grant Funds <br />Parks ACD <br />In- <br />Paid kind <br /> <br /> <br />Total <br />In- <br />Paid Kind <br /> <br /> <br />Cedar Revetment <br />cedar trees - cut and <br />prep 1800 0 1800 <br />duckbills ("88's" = 1/4") 3048 3048 0 <br />galvanized cable (1 x <br />19 strand core) (1/8") <br />(500' spool) 544 544 0 <br />forged wire rope clip <br />(2/tie) (1/4" = 4DV35) 192 192 0 <br />labor (1 five person <br />crew five days - <br />revetment installation) 5000 5000 5000 5000 <br />Cedar Revetment <br />Subtotal 0 0 <br /> 0 0 <br />Riparian Forest , ...../:< .:0 <br />Buffer - Riverbank . 0 <br />Herbicide for woody <br />veg. control (4 qts) 40 40 0 <br />Live stakes (shrub <br />willow) (2000 ft2) <br />(space 4 x 2) 625 625 0 <br />plugs (2 acres along <br />south side of trail; <br />scattered and grouped <br />- 100 flats of 50) 1672 1672 0 <br />Shrubs (scattered) <br />($27/25 bare root) 270 270 0 <br />Contingency 1000 1000 0 <br />Labor (grape <br />vi ne/buckthorn/tartarian <br />honeysuckly cutting <br />and herbicide) 1500 500 1500 500 <br />Labor (plantings - live <br />stakes & shrubs) 1600 500 1600 500 <br />Labor (planting - plugs) 3250 500 3250 500 <br />Riparian Forest Buffer - <br />Riverbank Subtotal 0 0 <br /> 0 0 <br /> 0 0 <br />Riparian Forest <br />Buffer-Pond 0 0 <br />herbicide (for spot . <br />spray) (1/20 or 1.5qt) 25 25 0 <br />cover crop (for bare 100 100 0 <br /> <br />Great River Greening <br /> <br />18 <br />