Laserfiche WebLink
<br />NORTHSTAR COMMUTER RAIL PROJECT <br />Average Unit Costs <br /> <br /> Proposed Unit March <br />MnDOT No. Item Descrintlon Unit Price /2008$\ Averane Cost Source Comments <br />2031.602 Combination Field Laboratorv -Office EA $ 31 200.00 <br />2101.501 Clearina AC $ 1,872.00 $ 1.507.00 MnDOT Ava. Bid Price 30 contract occurrences <br />2101.502 Clearina TREE $ 104.00 $ 108.00 MnDOT Avo. Bid Price 26 contract occurrences <br />2101.506 Grubbino AC $ 1 872.00 $ 1 735.00 MnDOT Avo. Bid Price 30 contract occurrences <br />2101.507 Grubbino TREE $ 104.00 $ 97.00 MnDOT Ava. Bid Price 26 contract occurrences <br />2102.501 Remove Pavement Markino SF $ 1.30 $ 1.25 MnDOT Av . Bid Price 6 contract occurrences <br />2102.502 Remove Pavement Marklno LF $ 0.52 $ 0.40 MnDOT Av . Bid Price 17 contract occurrences <br />2104.501 Remove Curb and Gutter LF $ 3.12 $ 1.80 MnDOT Av . Bid Price 36 contract occurrences <br />2104.501 Remove Fence LF $ 4.16 $ 3.15 MnDOT Av . Bid Price 12 contract occurrences <br />2104.501 Remove Retalnlna Wall LF $ 8.32 $ 7.24 MnDOT Avo. Bid Price 4 contract occurrences <br />2104.501 Remove Sewer Pice (Storm\ LF $ 10.40 $ 9.50 MnDOT Avo. Bid Price 14 contract occurrences <br />2104.503 Remove Concrete Foundation SF $ 4.16 RS Means <br />2104.505 Remove Bituminous Pavement SY $ 4.16 $ 1.65 MnDOT Avo. Bid Price 53 contract occurrences <br />2104.505 Remove Concrete Pavement SY $ 5.20 $ 3.10 MnDOT Avo. Bid Price 18 contract occurrences <br />2104.505 Remove Concrete Walk SY $ 5.20 $ 4.13 MnDOT Ava. Bid Price 10 contract occurrences <br /> Common Ex Price - <br />2104.505 Remove Gravel Drivewav SV $ 1.38 assume 8" of oravel <br />2104.509 Remove Liaht Base Foundetion EA $ 15.60 $ 133.00 MnDOT Ava. Bid Price 2 contract occurrences <br />2104.509 Remove Sian EA $ 156.00 $ 150.00 Bid orice from Northdale Blvd. <br />2104.513 Sawino Bituminous Pavement (Full Decth\ LF $ 4.16 $ 3.60 MnDOT Ava. Bid Price 4 contract occurrences <br />2104.521 Salvane Concrete Pice Storm Sewer LF $ 10.40 $ 10.00 MnDOT Avo. Bid Price 2 contract occurrences <br /> Assume salvage to Metro <br />2104.523 Salvaoe Bus Shelter EA $ 312.00 Transit: 3 hr to remove <br />2104.523 Salvaae Castina Assemblv EA $ 208.00 $ 170.00 MnDOT Avo. Bid Price 4 contract occurrences ' <br />2104.523 Salvaae Hydrant EA $ 530.40 RS Means <br />2104.523 Salyaae Liaht - Standard EA $ 208.00 $ 154.00 MnDOT Ava. Bid Price 2 contract occurrences <br />2104.601 Haul Salyaoed Material MI $ 8.32 RS Means One way from site <br />2104.602 Abandon Manhole (Storm\ EA $ 312.00 $ 300.00 MnDOT Ava. Bid Price o contract occurrence <br />2104.602 Abandon Manhole (Sanitarv\ EA $ 312.00 $ 300.00 MnDOT Ava. Bid Price 1 contract occurrence <br />2104.603 Abandon Pine lWater) LF $ 6.24 $ 5.30 MnDOT Ava. Bid Price 2 contract occurrences <br />2104.603 Abandon Pice IStcrm) LF $ 12.48 Bid crice from Parkway Lift Staticn <br />2104.603 Abandon Pine (Sanitarv\ LF $ 12.48 Bid crlce from Parkway Lift Station <br />2104.603 Remove Abandoned Pice Sewer (Sanitarv\ LF $ 9.36 $ 8.84 MnDOT Ava. Bid Price 6 contract occurrences <br />2105.501 Common Excavation CY $ 6.24 $ 3.00 MnDOT Ava. Bid Price 79 contract occurrences <br />2105.521 Granular Borrow ICYl CY $ 7.28 $ 5.81 MnDOT Avo. Bid Price <br />2105.522 Select Granular Borrow ICVl CY $ 9.36 $ 7.86 MnDOT Avo. Bid Price <br />2105.523 Common Borrow ICVl CY $ 5.20 $ 5.00 MnDOT Ava. Bid Price <br />2105.525 Toosoi! Borrow ICVl CY $ 8.84 $ 8.50 MnDOT Ava. Bid Price 30 contract occurrences <br />2211.501 Aaarenate Base Class 5 TON $ 21.84 Bluff Creek Bid Tab <br />2301.502 Concrete Pavement Standard Width 7" SY $ 5.30 MnDOT Avo. Bid Price <br />2301.561 Permanent Terminal Header LF $ 29.12 $ 28.00 MnDOT Avo. Bid Price 7 contract occurrences <br />2350.501 Tyce MV3 Wearino Course Mixture IB\ TON $ 46.80 MnDOT Avo. Bid Price <br />2350.502 Tvce MV3 Non-Wearina Course Mixture /B\ TON $ 46.80 MnDOT Ava. Bid Price <br />2356.604 Bituminous Seal Coat SY $ 0.21 $ 0.16 MnDOT Ava. Bid Price 9 contract occurrences <br />2357.502 Bituminous Material for Tack Coat GAL $ 1.04 $ 0.80 MnDOT Ava. Bid Price 117 contract occurrences <br />2501.515 12" RC Pine Anron EA $ 468.00 <br />2501.515 15" RC Pine Anron EA $ 520.00 $ 345.00 MnDOT Ava. Bid Price 13 contract occurrences <br />2501.515 18" RC pine Anron EA $ 572.00 $ 440.00 MnDOT Avo. Bid Price 21 contract occurrences <br />2501.515 21" RC Pice Acron EA $ 598.00 MnDOT Ava. Bid Price <br />2501.515 24" RC Pice Acron EA $ 624.00 $ 510.00 MnDOT Avo. Bid Price 31 contract occurrences <br />2501.515 27" RC Pice Aoron EA $ 676.00 $ 560.00 MnDOT Ava. Bid Price 4 contract occurrences <br />2501.515 36" RC PiDe Acron EA $ 936.00 MnDOT Ava. Bid Price <br />2501.515 42" RC Pice Acron EA $ 1144.00 $ 1010.00 MnDOT Ava. Bid Price 10 contract occurrences <br />2501.515 48" RC PIM Anron $ 1 352.00 $ 1 324.00 MnDOT Ava. Bid Price <br />2501.602 Trash Guard for 12" Pioe Acron , EA $ 312.00 <br />2501.602 Trash Guard for 15" Pice Acron EA $ 364.00 $ 230.00 MnDOT Ava. Bid Price 1 contract occurrence <br />2501.602 Trash Guard for 18" Pi e Aoron EA $ 468.00 $ 370.00 MnDOT Avo. Bid Price 3 contract occurrences <br />2501.602 Trash Guard for 21" Pi e Anron EA $ 520.00 <br />2501.602 Trash Guard for 24" Pi e Acron EA $ 572.00 $ 440.00 MnDOT Ava. Bid Price 5 contract occurrences <br />2501.602 Trash Guard for 27" Pi e Anron EA $ 624.00 <br />2501.602 Trash Guard for 30" Pine Anron EA $ 728.00 $ 494.00 MnDOT Ava. Bid Price 1 contract occurrence <br />2501.602 Trash Guard for 36" Pice Acron EA $ 780.00 <br />2501.602 Trash Guard for 42" Pice Acron EA $ 832.00 $ 682.00 MnDOT Ava. Bid Price 3 contract occurrences <br />2501.602 Trash Guard for 48" Ploe Acron EA $ 1 040.00 $ 790.00 MnDOT Ava. Bid Price <br />2503.511 12" RC Pine Sewer LF $ 30.16 $ 29.00 MnDOT Avo. Bid Price 5 contract occurrences <br />2503.511 12" RC Pine Sewer - Jacked LF $ 286.00 $ 225.00 MnDOT Avo. Bid Price 1 contract occurrence <br /> <br />Ramsey 30% Plans Cost Estimate 20090217.xls - Avg. Prices <br /> <br />Page 8 of 12 <br /> <br />2/26/2009 <br />