Laserfiche WebLink
<br />Capital Improvement Program <br />City of Ramsey, Minnesota <br /> <br />2009 thru 2013 <br /> <br />Pr(IJe~t # <br /> <br />06..PARK..013 <br /> <br />Contuct <br />Department ?tlrk Improvements <br />T)'pe Improvement <br />U~~f\ll Life 20 Years <br />ClItCf,llJfY Park Improvement <br />PI'lorlt)' n/ll <br /> <br />ProJc~t :'-lame Peltzer Park Connections <br /> <br />Description I Totnl Project ost 45,000 <br />. <br />Extending the access trail to the, play equipment. around the cu] de Sile easterly taright-at-way on 148th lane, <br />The second connection, further to the east, would require acquisition cfpart clthe lot presently l12anaged by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cui de sac of Garnet Street. <br />JU"stification I <br />Two important trail 9Pportunities exist relative to Peltzer Park, The first is immediately available, and consists of extending thell.ccess trail to the <br />play equipment - around the cui de sac easterly to right-of-way on 1 48th lane. This provides residents of Regency Ponds more of a direct access to <br />the parle <br />The second connection,further to the east, would require acquisition of part of the lot presently managed by MPCA. This would allow for street, <br />il.11d/t)r trail connections from 148th to the cui de sac of Gamet Street, and thereby improve acceSS to both Peltzer and Alpine Parks - as well as , <br />provide a circuitous walking loop within these neighborhoods. (See also Savanna Trail bridge.) <br />Modest silmafle and Imoroved landscaM at Peltzer would be a benefit as well. . <br /> <br />C $ <br /> <br />Expenditures 2009 <br />Improvament~ Other than Build <br /> <br />rotal <br /> <br />2010 <br />45,000 <br />45,000 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />Total <br />4Q.OOO <br />45,000 <br /> <br />Total <br /> <br />2010 <br />45,000 <br />45,000 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />Total <br />45,000 <br /> <br />45,000 <br /> <br />Funding Sources 2009 <br />Park Improvement Trust Fund <br /> <br />R~v;';;1;lr'J~' <br /> <br />37 <br />