My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/21/2009
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2009
>
Agenda - Council Work Session - 07/21/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:17:27 PM
Creation date
7/20/2009 11:15:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/21/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX B <br /> <br />Street Maintenance Program Assessment Practices <br /> <br />1. Projects are identified by individual subdivision, or by grouping of subdivision and lots <br />having similar pavement histories and conditions and similar pavement areas per benefited <br />unit. <br /> <br />2. An assessment share will be calculated by determining the total assessable cost of the <br />project and dividing by the number of benefited units. <br /> <br />3. Where an individual lot has more than one frontage and not all frontages are scheduled to <br />receive an improvement or the same type of improvements, the lot will be considered <br />benefited and be assessed a full share for the improvement which is conducted along the <br />frontage of the lot that contains the main driveway opening. <br /> <br />4. For overlays the amount assessed to benefited property owner is 50% of the total project <br />cost including overhead costs. (1991). <br /> <br />5. For sealcoats the assessment to benefited property owner shall be 43% of the total project <br />cost including overhead costs in program year 2008, and shall be reduced by 7% in each <br />successive year until reduced to an 8% assessment in program year 2013. after the 2013 <br />program there shall be no assessment for sea1coats. (2007). <br /> <br /> <br />7. Where the rule of dividing the assessable project cost by the number of benefited units (no. 2 <br />above) would result in an assessable share which is grossly out of proportions to the <br />assessable share being charged to similar lots receiving similar improvements, the City <br />Council may elect to assess such lots the average assessable share being made to lots <br />receiving similar improvements for that project year. (1996) <br /> <br />8. Where a benefited area contains commercial lots having widely varymg SIzes, the <br />assessment shall be made based on area ofthe lot. (2003) <br /> <br />9. Where an individual lot has more than one frontage including a driveway frontage on a state <br />or county road, and a non-driveway frontage on a MSA or city street, one-half assessment <br />share will be made for an improvement to the MSA or City street (1995) <br />
The URL can be used to link to this page
Your browser does not support the video tag.