My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/06/2009
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2009
>
Agenda - Planning Commission - 08/06/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:00:36 AM
Creation date
7/30/2009 3:04:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/06/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />'~However, in residential zones, some <br />argue that a turbine's setback should <br />be no different than that of a house, <br />cellular tower, flag pole, street lights, <br />orany other engineered structure, <br />and that height should not be expressly <br />limited nor specified in zoning <br />regulations. .Instead, they argue that <br />in residential zones turbine heights are <br />already self-regulated based on sound <br />level restrictions at the property line. <br /> <br />Also keep in mind that: <br /> <br />. Turbines on the market an;: <br />engineered to withstand hurricane <br />force winds (110 -130 mph). <br /> <br />. Allowing abutting property owners <br />to submit signed easements may be an <br />alternative form of compliance should <br />roads and utility lines be absent in the <br />immediate vicinity. <br /> <br />. A manufacturer's engineering <br />specifications should be an acceptable <br />means of ensuring safety and practicality. <br /> <br /> <br />Bergey Wind Power <br />lkW turbine <br /> <br /> <br />Skystream 1.8kW turbine <br /> <br />because sound and setback <br />requirements, which are usually <br />more restrictive, makesuch a <br />.stiplJlation redundant. Such a <br />requirement may contribute only <br />to additional administrative burdens <br />and unnecessarily limit the use of <br />wind turbines. <br /> <br /> <br />Allowing abutting property oWners to submit signed easements <br />may be an alternative form of compliance should roads and <br />utility lines be absent in the immediate vicinity. <br /> <br />2. Lot Size: <br /> <br />Some zoning rules limit turbines <br />and/or their heights to a corresponding <br />property size. For example, some <br />jurisdictions limit tower height to 80 feet <br />for lots 0.5-1.0 acre and impose no <br />height limit for lots larger than 1.0 acre. <br /> <br />Skystream 1.8kW turbine <br />dual-use on lamppost <br /> <br /> <br />This regulatory approach, however, <br />usually has no meaningful effect simply <br />
The URL can be used to link to this page
Your browser does not support the video tag.