My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/11/2009
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2009
>
Agenda - Council Work Session - 08/11/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:18:21 PM
Creation date
8/6/2009 1:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/11/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iffilNTEREUM <br />. <br /> <br />Date: February 11, 2009 <br /> <br />Proposal To: City of Ramsey <br />Heidi Nelson <br /> <br />Proposal For: Municipal Center <br />Ramsey, Minnesota <br />Remove systems furniture on floor 1 (14 - A02 stations) and relocate on floor 2. <br />Provide layout for new floor 1 service center and reconfigure on floor 2. This <br />proposal does not include any design work for possible DIRTT product on floor 1. <br /> <br />INTERIOR DESIGN SERVICES <br /> <br />1. Project Development <br /> <br />1.1 Conduct project orientation meeting with Client and others to review project goals, budget, <br />timetable and building plans. Review Design Process. <br /> <br />1.2 Finalize time table with the Client and other consultants/contractors involved with <br />project. <br /> <br />1.3 <br /> <br />Meet with Client to confirm departmental work processes, quantity of employees and <br />special area requirements. <br /> <br />1.4 <br /> <br />Obtain necessary information regarding workstation needs and departmental interaction <br />to develop schematic block plans and develop workstation typicals. <br /> <br />1.5 <br /> <br />Inventory any existing furniture that may be utilized for project. <br /> <br />2. Schematic Design <br /> <br />2.1 <br /> <br />Field verify dimensions and any architectural elements (i.e.: HVAC, electrical, fire <br />extinguishers, etc.) that may interface with the furnishings layout. Field verification may <br />occur after furnishing orders are entered. Intereum Designer will note critical dimensions <br />on the HMI furniture plans and send to owner/architect. <br /> <br />Develop individual space block diagram. The block diagram defines individual <br />adjacencies within departments and includes special work areas. <br /> <br />2.2 <br /> <br />2.3 <br /> <br />Obtain approval of block diagram. <br /> <br />EO <br />t\ <br />g <br /><D <br />B <br />i <br /> <br /> <br />en <br /><::3 <br />'" <br />:2 <br />::;: <br />ci> <br />"" <br />r-- <br /> <br />o <br />"" <br />'" <br />:2 <br />:r <br />M <br />"" <br />r-- <br />Co <br /> <br />::;: <br />""" <br />1.0 <br />..., <br />z <br />:2 <br /> <br />{S <br />=> <br /><::> <br />E <br />>- <br />a:: <br /> <br />E <br />(; <br />z <br />'" <br />'" <br />.3 <br />.~ <br />~ <br />C5 <br />CD <br />..., <br />""" <br />00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.