Laserfiche WebLink
<br />Working with the Upper Rum River WMO and Anoka Conservation District on Rogers Lake being <br />classified as impaired will begin in 2010. This will include the identification of nutrient sources and <br />preparation of an implementation plan to address the problem. <br /> <br />Work on assessing issues associated with the Anoka Dam will begin in 2010. The WMO will <br />coordinate the discussions with the member municipalities in determining corrective measures that <br />may be necessary and the financial responsibility for the corrective measures. <br /> <br />Enforcement <br /> <br /> <br />Enforcement of the plan shall be consistent with 8410 and the provisions of the Joint Powers <br />Agreement dated September 5,1995 including subsequent amendments, December 6, 2007. <br /> <br />Administration Process <br /> <br />Subpart 6.. Administration Process. Each organization plan mustspecify theadministratiye <br />process and timeliness for the submittal, review, and approval of local plans and variances <br />by the organization. <br /> <br />SA: MSs 103B.I01;103B.211; 103B.231; 103B.227 <br />HIST: 17 SR 146 <br /> <br />Each local government unit within the boundaries of the WMO has prepared a local plan that is in <br />conformance with the WMO plan and 8410 rules for local plan content. Local plans shall be updated <br />as necessary within two calendar years after the WMO officially adopts this third generation plan. <br /> <br />Water Management Plan <br />P:\Mpls\23 MN\02\2302047\WorkFiles\3rd Gen WMP\LRRWMO_3rd Gen WMP_July 2009_Draft.doc <br /> <br />96 <br />