My WebLink
|
Help
|
About
|
Sign Out
Home
09/08/09
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2009
>
09/08/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 3:04:22 PM
Creation date
9/3/2009 3:39:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
09/08/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II. Develop the design to match current architecture with respect to function, durability, <br />and overall economy. <br />.. Coordination of the architectural, structural, civil, mechanical, electrical and plumbing <br />designs in order to integrate the building systems. <br />.. Document the decisions and provide an estimated cost of construction. <br />.. Prepare a DO level probable cost of construction. <br /> <br />Construction Documents: <br />.. Complete the design of the facility. <br />.. Review and coordinate with the various design disciplines and City staff. <br />.. Prepare drawings and specifications necessary for the City to competitively bid the <br />construction of this facility and meet Federal~Aid standards <br />.. Prepare a CD level probable cost of construction. <br /> <br />Bidding/ Construction Administration: <br />.. Not included in this proposal - will be provided upon request when City is prepared <br />to Bid and Construct the improvements. <br /> <br />COMPENSATION <br /> <br />LSA Design will contract directly with the owner for professional services and request <br />that the basis of our contract be "AlA B141~1997 Standard Form of Agreement between <br />Owner and Architect". LSA Design Inc. will select sub-consultants in consultation with <br />City of Ramsey staff to insure a mutually compatible design team. LSA Design Inc. will <br />provide the professional services on a lump sum basis as follows: <br /> <br />. MnDOT and CMAQ Submittals <br />. SD/Design Development <br />. Construction Documents <br />. Construction Administration <br />.' Reimbursable Estimate <br />. Soils, Special Inspection, Permits Estimate <br />Total Fees. <br /> <br />$ 16,000.00 <br />$ 26,000.00 <br />$ 90,500.00 <br />NIC <br />$ 5,000.00 <br />NIC <br />$ 137,500.00 <br /> <br />Reimbursable expenseswill be invoiced at 1.1 times the actual cost and shall include <br />such items as transportation, postage, express delivery services, plotting and <br />reproduction of drawings and specifications. <br /> <br />Project Schedule <br />LSA Design Inc. wi!! schedule our services with those of the other consultants for this <br />project in order to avoid unreasonable delay and shall perform their services as <br />expeditiously as is consistent with professional skill and care and the orderly progress of <br />the project, in order to achieve the following milestone dates; <br /> <br />TASK <br />Project Kickoff Meeting <br />MnDOT/CMAQ Submittals <br />Schematic Design <br />Design Development <br />Construction Documents/MnDOT Submittal <br />MnDOT Final Approvals <br /> <br />COMPLETE <br />September 2009 <br />November 2009 <br />December 2009 <br />February 2010 <br />March 2010 <br />April/May 2010 <br /> <br />2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.