My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 09/22/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:20:48 PM
Creation date
9/17/2009 4:20:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # ,~, <br />PUBLIC HEARING AND LEVY OF SPECIAL ASSESSMENTS <br />FOR THE 2009 STREET MAINTENANCE PROGRAM <br />By: Steven J Jankowski, Assistant City Engineer <br />Background: <br />The 2009 Street Maintenance Program consists of eleven individual projects addressing the <br />maintenance needs of 15.65 miles of streets. One project, IP 09-1 1, which was proposed as a <br />bituminous overlay for portions of the Barthels Rum River 2"d subdivision was eliminated due to <br />a petition opposing the project. Ten (10) projects involved the crackfilling/sealcoating of 15.02 <br />miles of roadway in various locations, and one (1) project involved a one and one half (1 %i) inch <br />bituminous overlay of 0.63 miles in the Hunters Hills subdivision. Individual projects were <br />combined for subdivisions having similar pavement areas per unit into single projects to reduce <br />administration costs. <br />All projects have been substantially completed and the final costs have been determined. It is <br />City policy to assess 50% of the project cost to the benefiting property owners for overlay <br />projects. The sealcoat/crack fill assessments were previously also assessed 50% of the project <br />cost, however the assessment on this type of maintenance work is being phased out over the next <br />several years, and therefore this year's assessment is 36% of the project cost. The remaining <br />portions of these projects are financed through City general funds and Municipal State Aid <br />(MSA) funds for IP 09-10 which includes MSA streets. <br />Below is a summary of the assessments proposed on each project along with a comparison to the <br />estimated cost mailed to property owners prior to the March 11, 2008 public hearing. The actual <br />project costs came in lower than those estimated in the feasibility study as illustrated below. The <br />reduced actual costs are mainly the result of lower oil based products in June when the work was <br />bid as compared to January when the feasibility report was prepared. <br />Project Description Proposed Feasibility % of <br /> Assessment Study Est. Est. <br /> Sealcoats /Crackseal <br />09-02 Bowers Mississippi Acres $ 136.99 $ 151.40 90.5% <br />09-03 Greenland Hills & Pineview Estates $ 240.73 $ 263.06 91.5% <br />09-04 Halland Acres $ 187.41 $ 192.90 97.2% <br />09-05 Reilley Estates $ 354.05 $ 402.27 88.0% <br />09-06 Section 21 (Unplatted) $ 194.68 $ 200.36 97.2% <br />09-07 Rum Acre Estates $ 239.77 $ 275.21 87.1% <br />09-08 Rum River Hills $ 301.24 $ 342.48 88.0% <br />09-09 BRRA WPE- South $ 289.13 $ 333.39 86.7% <br />09-10 MSA $ 243.00 $ 270.13 90.0% <br /> Bituminous Overlays <br />09-12 Hunters Hill $ 1,206 $ 1,365 88.4% <br />
The URL can be used to link to this page
Your browser does not support the video tag.