My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 09/29/2009
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2009
>
Agenda - Council Work Session - 09/29/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:21:39 PM
Creation date
9/25/2009 10:37:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
09/29/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT UNDERSTANDING <br /> <br /> <br />IIKGi <br />Page 8 . Park Design Services <br /> <br />Based on the information identified in the RFP and our past experience in working with the <br />City of Ramsey on the 2001 Comprehensive Plan and subsequent Town Center Ordinance, <br />the HKGi/MSA team has a general understanding of the significance of the Town Center <br />and development of the East Meandering Commons Park. The park is positioned in the <br />center of the future mixed-use town center and provides an important open space central <br />to this future compact development. The park will function as both a symbol of Civic space <br />and a destination for casual and community oriented gathering. The park also functions <br />as an important ecological system in the management of stormwater runoff. <br /> <br />There is a great deal more to learn as we begin the project. Here is a general overview of <br />our project understanding to date: <br /> <br />· The City of Ramsey has taken significant steps toward the development of the mixed-. <br />use town center and the East Meandering Commons Park is a critical civic space to the <br />success of the town center's future. <br /> <br />. This project is a continuation of the concept planning and schematic design prepared <br />for the Meandering Commons Park. <br /> <br />. The project will focus on the design of active and passive open space, providing <br />gathering space for programmed events, natural landscape environments, and <br />stormwater management areas. <br /> <br />· This project will build upon the strengths ofthe Town Center Master Plan and the park <br />concept plan. Those plans will be considered a general framework for the starting <br />point of more detailed design. Additional concepts will also be developed during the <br />Master Plan phase of the project. Coordination with planned adjacent mixed use and <br />residential projects will need to occur throughout the design process to ensure that <br />early improvements remain viable through future phases. <br /> <br />· Phase One of the East Meandering Commons Park, which includes an amphitheater, <br />pedestrian bridge, trails and other amenities is scheduled for completion by June 30, <br />2010. <br /> <br />· The East Meandering Commons Park is anticipated to take several years to be <br />completely funded and built. The funding will be a combination of park dedication <br />and grants and our approach to the Master Plan should accommodate the reality of <br />variable funding scenarios. <br />
The URL can be used to link to this page
Your browser does not support the video tag.