Laserfiche WebLink
<br />Case # 1 <br /> <br />Consider Marquis Sign on Hwy 10 <br /> <br />By: Sean M. Sullivan, Economic Development Coordinator <br /> <br />Background: <br /> <br />The Ramsey EDA directed Staff to gather information on marquis signage on Highway 10. Staff <br />has been in contact with Rick Ballantyne from Schad-Tracy signs and John Mylrea from Grabow <br />Communications Group. Mr. Ballantyne has provided the City with the costs associated with the <br />sign located at' Coborn's. Staff has conveyed some of the questions regarding functionality and <br />connectivity of sign to Mr. Mylrea. Mr. Mylrea has offered his time to make a presentation to <br />the EDA to educate the EDA on types of signage, capabilities and estimated costs. Attached is <br />some information from about the sign at Coborn's. The EDA should give staff direction based <br />on the presentation and cost associated with each sign type. <br /> <br />Funding Source: EDA levy <br /> <br />Staff Recommendation: <br /> <br />Direct staff to research a specific sign type further and to bring a formal cost estimate forward.' <br /> <br />EDA Action: <br /> <br />Motion to direct staff to gather additional information on sign type _ and to bring forward a <br />formal cost estimate. . <br /> <br />Attachments <br /> <br />Coborn's Sign information. <br /> <br />EDA: 10.08.09 <br /> <br />5 <br />