Laserfiche WebLink
<br /> <br />WALKER <br />PARKING CONSULTANTS <br /> <br />Mr. Brian Meyer, P.E. <br />City of Ramsey <br />September 16,2009 <br />Page 2 of 6 <br /> <br />PROJECT SCHEDULE <br /> <br />We are fully prepared to meet the project schedule and anticipate documents will be ready for <br />bidding by February 2010. <br /> <br />Proiect Start <br />Schematic Design Stair/Elevator <br />MnDOT Submittals <br />Design Development <br />Construction Documents <br />MnDOT Submittal <br />MnDOT Approvals <br /> <br />. September 2009 <br />November 2009 <br />November 2009 <br />December 2009 <br />January 2010 <br />January 2010 <br />March 2010 <br /> <br />SCOPE OF SERVICES <br /> <br />MNDOT/CMAQ SUBMITTALS <br /> <br />1. Complete Delegating Contracting Process, Project Memorandum and revisions to Categorical <br />Exclusions required for MnDOT review and approval. <br />2. Confirm original Phase /I planning document footprint is still accurate and there are no <br />additional Right of Way requirements. <br />3. Resubmit ROW Certificate #1. <br /> <br />SCHEMATIC DESIGN <br /> <br />1. Confirm with City of Ramsey the number of parking spaces to be provided. <br />2. Design the internal circulation for both vehicular and pedestrian flow for new elements <br />including new west stair/elevator tower. <br />3. Layout preliminary striping for the parking facility. <br />4. Locate and size new stair towers according to code and operational coordinating with new <br />development requirements. <br />5. Select architectural concepts and materials. <br />6. Prepare preliminary plans and outline specifications for the recommended scheme illustrating; <br /> <br />a. Internal parking structure, vehicular and pedestrian traffic flow; <br />b. Preliminary parking layouts including bay sizes, parking stall size and turning radii. <br />c. Locations of parking structure entry and exit lanes. <br />. d. Recommend parking structure security provisions. <br />e. Preliminary architectural elevations illustrating materials and concepts. <br /> <br />7. Prepare a preliminary estimate of the probable construction cost for the parking facility. <br />8. Present the project schematic design to City of Ramsey. <br /> <br />M: \_PROPOSAL\Proposol 2009\City of Ramsey \Prop 091609 Olson .doc <br />