Laserfiche WebLink
<br />Joint Powers Agreement Evaluated Roadways and Intersections <br /> <br />The roadway improvements and associated costs for the improvements for Ramsey Town <br />Center, as outlined in the Joint Powers Agreement are shown in Tables 3 and 4. <br /> <br />The Joint Powers Agreement outlines improvements on surrounding roadways, which <br />includes the following: <br /> <br />Roadways: <br /> <br />. Armstrong Boulevard <br />o 4-Lane Divided Roadway (TH 10/169 to 1000' North of Bunker Lake <br />Blvd.) . <br />. Bunker Lake Boulevard <br />o 4-Lane Divided Roadway (Armstrong Blvd to 1000' West of Ramsey <br />Blvd) <br />· Ramsey Boulevard: <br />o 4-Lane Divided Roadway (TH 10/169 to 1000' from Bunker Lake Blvd.) <br />· Sunfish lake Boulevard <br />o 4-Lane Divided Roadway (TH 10/169 to 1000' North of Ramsey Blvd) <br /> <br />Intersections: <br /> <br />· Armstrong Boulevard & Bunker Lake Boulevard <br />o Signal Added <br />· Armstrong Boulevard & Sunwood Drive, Coordinate with RR Crossing <br />o Signal Added, left turn lane SB and right turn lane NB <br />· Bunker Lake Boulevard & Town Center Drive <br />o Signal Added, turn lanes on Bunker Lake Boulevard <br />· Ramsey Boulevard & Bunker Lake Boulevard <br />o Signal Added, turn lanes added on all approaches <br />. Ramsey Boulevard & Sunwood Drive <br />o Signal Added, turn lanes added on all approaches, Coordinate with RR <br />Crossing <br />· Sunfish Lake Boulevard & Bunker Lake Boulevard <br />o Signal Added <br />· TH 10/169 & Armstrong Boulevard <br />o Signal Improvements, RR Crossing Upgrade <br />. TH 10/169 & Ramsey Boulevard <br />o Signal Improvements, RR Crossing Upgrade <br />· TH 10/169 & Sunfish Lake Boulevard <br />o Signal Improvements, RR Crossing Upgrade <br /> <br />Page 7 of 14 <br />