Laserfiche WebLink
CONTINUATION SHEET <br />AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing <br />Contractor's signed Certification is attached. <br />in tabulations below, amounts are stated Jo the nearest dollar. <br />Use Column 1 on Contracts m4we variable retainage for line items may apply. <br />ITE <br />N <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />1 <br />1 9 <br />1 2 <br />1 3 <br />9 4 <br />1 5 <br />1 6 <br />1 <br />7 <br />AIA DOCUMENT G703 - APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 - AIA' 1992 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, '1735 NEW YORK AVENUE, N-W., WASHINGTON, D.C. 2WW <br />A _ R C D <br />M DESCRIPTION OF WORK SCHEDULED WORK TOTAL BALANCE RETAINAGE <br />O. VALUE FROM COMPLETED PRESENTLY i COMPLETED ' div -C) : TO FISH 5% <br />PREVIOUS THIS PERIOD STORED j AND STORED ( C - G ) <br />APPLICATIONS I NOT IN i TO DATE <br />- - - -- -. i DORE) (0 +E +F) <br />Insurance & Bonds 63,800.00 I 63,800.00 a 0.00 53,800 00 1QD96 0.Ofl 3,190.00 <br />Engineering 8 Approval s` 205,700.00 102,850.00 102,850.00 205,700 00 100% 0.00 10,285,00 <br />Tank Material 514,300.00 0:00 1 488,585.00 488,585.00 95% 25,715.00 24,42925 <br />Tank Fabrication & Ship 514,300.00 J 0.00 1' 51,430.00 51,430.00 10% 462 2,571.50 <br />Temporary Fence /Layout <br />10.000-001 5,000.00 5,000_flfl 10,000.00 100 °l° 0.00 500-00 Access Road 30,000.001 0.00 s 22,500.00 i 22,500.00 75 ° l° 7.500.00 1,125.00 <br />Watermain 105.686.00 0.00 j 105,686.00 105,686A0 100° _ 0.00: 5,284.30 <br />Foundation Construction 170,300.00 127,725.00 1 42,575.00 1 ;' 170,300.00 100% 0-flD 8,515.00 <br />Tank Erection 785,014.00 0.00 0.001 <br />000 0'�° 785j)14_00 0.00 <br />0 Interior Slab 8,000.00 1 OAO I 0_001 000: t196 8,000_(10 0.00 <br />Control Room 1 7,000.00 ; 0.00) o-00 0.00 096 ! 7,000.00 0.00 <br />Overhead Door 5,500.00 1 0.00 , 0.00 1 0.00 0% 3,500.00 0.00 <br />Tank Paint 584,100.00 '' 0.00 0 -00 ' 0.00 ; 0% 584,100.00 D.00 <br />Sterilized & Test i 1,000.00 0.00 0.00 _ 0.00: 0% 9,000.00 0.00 <br />i Electrical /Controls 87,700.00 0.00 0.00 0 00 0 °1° 87,7{)0 #)t3 0.00 <br />- <br />Site Restoration 10,000AO 0.00 0.00 3 ° <br />0.00 fl I° 10,000.00 0.00 <br />Bituminous Roadwork 86,000.001 0.00 t)_00 0.00 ', 0% 86,000.00 0.00 <br />C -O- #1- Watermain Change . Tank ; 22,877.00 0.00 22,877 -00 22.877.00 100% 0.00 1,143.85 <br /># 3,211,277.00 i 299,375.00 1 841,503 -00 1 0.00 1,140,878.001 36% 2,070,399.00 57,043.90 - <br />AIA DOCUMEAlT 6703 PAGE 2 OF 2 PAGES <br />APPLICATION NUMBER: 3 <br />APPLICATION DATE: 09128/09 <br />PERIOD TO: 09125/09 <br />CBI CONTRACT NO_: 37147815 <br />ViK)RK MATERIALS <br />-- - - - - -- - <br />G703 -1992 <br />-- - - - - -- - <br />G703 -1992 <br />G703 -1992 <br />