Laserfiche WebLink
IP 08 -29 Alpine Park Watennain Loop <br />City of Ramsey <br />October 1, 2009 <br />Pay Estimate No. <br />Total Contract <br />Additional Wark <br />Total W/ Addnionat <br />Total Paid Hess retainagel <br />IP 08 -29 Alpine Park Watenoain Loop <br />s <br />Mobilization <br />I <br />LS <br />$3.800.00 <br />$3.950.00 <br />$1.750.00 <br />$3,8000;00 <br />$3,95[!00 <br />$1,7510.09 <br />0.75 <br />1.00 <br />0-50 <br />$2,850.00 <br />$3,950.00 <br />$875.00 <br />0.75 <br />1.00 <br />0.50 <br />32,850.00 <br />$3,950.00 <br />$875.00 <br />Clearing & Grubbing <br />1 <br />LS <br />Traffic Control <br />I <br />LS <br />Remove & Replace Mailbox <br />Remove Bit: Pavement <br />1 <br />1,800 <br />$202,842.58 <br />EA <br />SY <br />$17 &00 <br />52 -00 <br />$435 <br />$5.50. <br />$15.75 <br />$135.00 <br />$3.5110.00 <br />$$•037.50 <br />3192.50 <br />$55125 <br />1.00 <br />1,856.00 <br />8W.0D <br />35.00 <br />35.00 <br />$175.00 <br />33,712.00 <br />$4,037.50 <br />$192.50 <br />$55125 <br />1310 <br />1856.00 <br />850 -00 <br />35.00 <br />35310 <br />$175.00 <br />$3,71200 <br />$4,5137.511 <br />:6192.50 <br />$551-25 <br />Common Excavation to Stor-4ile <br />850 <br />CY <br />Remove 12 "CW . <br />35 <br />LF <br />Furnish & Install 12" CW <br />35 <br />LF <br />Furnish & Install 15" CMP w/Aproas <br />75 <br />LF <br />Sta.75 <br />$1.406.25 <br />84.00 <br />$1,575.00 <br />84.00 <br />$1,575:00 <br />Furnish & Install IS' RCP <br />80 <br />LF <br />$1900 <br />5510.00 <br />$1,150 -00 <br />35,245.00 <br />573 0.00 <br />SUM <br />$2 &40 <br />$23.00 <br />$1,520.00 <br />$1- 020.00 <br />$2,300.00 <br />$5,245.100 <br />$730.00 <br />493,925.00 <br />32 1.100 <br />$80500 <br />80.00 <br />2.00 <br />2.00 <br />1.00 <br />(310 <br />2.&W-00 <br />90.00 <br />36.W <br />81,520.00 <br />$1,020.00 <br />$2,300.00' <br />$5,245.00 <br />$730.00 <br />$92,852.50 <br />$2,286.00 - <br />$828A0 <br />80.00 <br />200 <br />2.00 <br />Lee <br />100 <br />2.857.00 <br />90.00 <br />36.00 <br />$1,520.00 <br />$1,020.00 <br />$2,300.00 <br />$5,245.110 <br />5730.00 <br />$92,852.50 <br />$2,286.00_ <br />$828.010 <br />Furnish & Install 15" FES <br />2 <br />EA <br />Furnish & Install 2'x T Catch basin <br />2 <br />EA <br />12" Wet Tap (including 12' gate valve & box) <br />Connect to Existing � Vater ma in <br />I <br />I <br />EA <br />EA <br />12 DIP W azemtain <br />2 <br />LF <br />8" DIP Watermain <br />LF <br />6" DIP Watennain <br />rLF <br />Directional Driil of 24" Steel Casing <br />5177310 <br />$3 0.975.00 <br />160.00 <br />$28,320.00. <br />160310 <br />$28,330.00 <br />City Of Ramsey <br />i <br />$274,027.50 <br />Total <br />$211,868.50 <br />$211,868.50 <br />$1,f350.00 <br />$1,650.00 <br />$1,650 -00 <br />$275,677.50 <br />$213,518.50 <br />$213,518-50 <br />$202,842.58 <br />3202,84 2.58 <br />This Pay <br />Completed <br />Appli-iion <br />to Elate <br />UNIT CONTRACT <br />QTY UNIT PRICE AMOUNT <br />Quantity <br />EXTENSION <br />Quantity EXTENSION <br />Page 1 of 2 <br />i <br />