My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 10/27/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:22:28 PM
Creation date
10/22/2009 12:30:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />INTEREU <br />r <br />r <br />.. <br />2.4 Prepare preliminary furnishings budget based on furniture standards. <br />n <br />2.5 Obtain approval of preliminary budget. <br />_= f <br />3. Design Development <br />3.1 Prepare preliminary drawings of the floor plan for floor 1 and 2, Illustrate the location and <br />layout of all furniture in the open plan, offices and special areas, <br />12 Obtain approval of final floor plans. Signature required, <br />3.3 Present final furnishing budget based upon the approved floor plan, <br />a <br />x <br />3.4 Prepare power layout for systems furnishings based upon the approved floor plan, <br />3.5 Prepare installation drawings to be reviewed with the Client and installers, The drawings <br />will specify critical dimensions, the location of all furnishings and any special instructions <br />necessary for order entry and complete installation, <br />F <br />4. Furniture Specification <br />4.1 Prepare furniture product specification by areas indicating quantity, product number and <br />complete description. <br />4.2 Prepare list of required product and existing product to be reused, indicating any product <br />that would need to be ordered. <br />5. Project Administration <br />5.1 Coordinate Project with Client. Document all meetings. Keep Client abreast of any new <br />developments. <br />5,2 Participate in post - installation walk- through to determine any items to be completed that <br />require design services, <br />6. Basle Compensation <br />6.1 Basic interior design, services shall be computed on an hourly basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.