My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 11/10/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:22:48 PM
Creation date
11/5/2009 2:06:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />supervision of the Public Works Street Supervisor or designated representative. <br /> <br />d. Street Snow Removal Policy <br /> <br />The City's snow removal policy requires the removal of snow from face of curb to <br /> <br />face of curb (F-F) of all local streets, roads and cul-de-sacs af1;,:wthe accumulation <br />:' ;~;:~;~O:~>>;' <br />.',~N <;:~~> <br />of two (2) or more inches of snow. This will also inc1uc!~;:idl~aring the intersection <br />i\,':',<,;"'C,_';'X, <br />..,~;;:~I:,~Y <'>:{~~~~;'" <br />leading into the cul-de-sac. Full instructions will 9~:;mclude(1~1~ith the route maps. <br />~,;~:;~.' ':<:~~~:~~~. ':;:~~;I~:;~"~ <br />It is the intention of the CITY to retain the,;;seffiitle~' of the CONTRA@TOR for <br />/;,~i~t~:~"" .:~~~~:;;?/ <br />each snow fall requiring removal u1l4~r the CXIY'S current Snow Removal <br /><;;:;i:;:~;;;~~*i~ >;~i;;~;';:~:' <br />Policy. Historically, Ramsey averag;s ap~f~~i%~tely 44 inches of snow per year <br />"~~;1~S0 ..,', <br />requiring 6 - 10 separate s~9w removal operati~iiti?;;;;I~~:;routes have been sized to <br />/:;~~~~~~~~;;'" ._~;::. _~;~~i:~:)' <br />allow snow removal opei~tiogS,'fd::H~;,9Qwpleted i:n%pproximately 8-10 hours with <br />.";}~ ';:;~$;i;/'i:;;}:i:~i~:> <br />equipment simi,lar: to that idenilfie(t:~~fein.;;i::;;/ <br />",;<i~~~\~<~'~:<' <~~~:;~_ ';~:;it~ri~?' <br />Scope o;~i~:~~tations'.:~~: '!::~~~:;~;, <br /> <br />It is t1itrntl~~~i:~fe:~'tIJf,~"$~t;the CONTRACTOR provide a minimum of (2) <br /> <br />j.;P.iegg~:'dt:~~qui;ifi~I\t to perform the entire snow removal operations as shown' by <br />. /;;~~i:Y .<~;;~;~;,. .*~~;i~;';i~~:;:' <br />.,@;i~t Exhibits "Ci;~~& C2~">'(Cul-de-Sac Routes). The Cul-de-Sac Routes shall be <br />,;;j~:g) '''<~~\)i::~,;:~~. . .,~'? <br />';::;:~~rformed b~tat least one % ton pickup vehicle per route. Additional pieces of <br />'.~~~~;~~:~~~" /;.:~;:~~~~~1-}' , <br />appi~~%i~i~:;type equipment for each Route may be used by the CONTRACTOR <br /> <br /><!;9:- <br />for arly or all snow removal operations with prior written approval of the CITY. <br /> <br />e. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.