Laserfiche WebLink
<br />Capital Improvement Program <br />City of Ramsey) Minnesota <br /> <br />20o'9'thru 2013 <br /> <br />Pr'oJeat # <br /> <br />08~STR~OO 1 <br /> <br />Contact <br />Department Street Improvements <br />T)'pe Improvement <br />llscful LIl'e 20 Years <br />Clltegol'~ Street Improvement <br />p ..l(wl t)' lila <br /> <br />Project Name Dysprosium StI'eet <br /> <br />Description . I' . <br /> <br />Dyspl'oslum Streot botwoen Bunl~er Lake Boulevatd and Nowthen'Boulevard was constructed in the mid 80's. It has been seal coated but not <br />overlaid" This orolet! includes reconstruction of the street to 38 feet wide with a sIdewalk along the east side, <br /> <br />Justi;t1eation -, <br /> <br />The street IS showing signs of\\'ear al1d needs re6onst~uctlon.. The pavement surface is 45 feet wide and can b~ narrowed without Impacting users, I <br /> <br />TotAl ProJ.ect Cost 5900,000 <br /> <br />I <br /> <br />,Expenditures, <br />Improvements Other than Build <br /> <br />Total <br /> <br />'2009 <br />900,000 <br />900,000 <br /> <br />2010 <br /> <br />, 2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />Total <br />900,000 <br /> <br />900,000 <br /> <br />.1.1 <br /> <br />Funding $oul't:es <br />MSA <br /> <br />2009 <br />900,000 <br />Total 900,000 <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />20t3 <br /> <br />Totnl <br />90Q,OOO <br />900,000 <br /> <br />; .,\ <br /> <br />, /1(!l'lsati 0 !/OB <br /> <br />268 <br />