Laserfiche WebLink
FINAL PAY ESTIMATE NO. 2 <br />Date: October 30, 2009 <br />Project: 2009 Pavement Maintenance Program — Division C <br />Contractor: WB Miller Inc. <br />Contract Amount: $ 14,777.50 <br />Award Date: June 23, 2009 <br />The following work has been completed on the above referenced project: <br />Item Qnty Unit Unit price Extension <br />1 Mobilization 1 Is $ 350.00 $ 350.00 <br />2 Traffic Control 1 Is $ 6,500.00 $ 6,500.00 <br />3 Sawcut Bituminous 198 Ift $ 3.00 $ 594.00 <br />4 Remove Concrete C &G 126 Ift $ 4.00 $ 504.00 <br />5 Install B618 C &G 126 Ift $ 14.00 $ 1,764.00 <br />6 Modified Class 5 17.5 tn $ 55.00 $ 962.50 <br />7 Bituminous Leveling Course 25.2 tn $ 150.00 $ 3,780.00 <br />8 Bituminous Base Course 15.05 tn $ 120.00 $ 1,806.00 <br />9 Bituminouis Tack Material 40 tn $ 5.00 $ 200.00 <br />10 Bituminous Wear Course 40.3 gal $ 120.00 $ 4,836.00 <br />11 Epoxy Crack Sealer 60 ft $ 4.00 $ 240.00 <br />FC Stripping 1 Is $ 200.00 $ 200.00 <br />FC Remove and replace guardrail 3 hr $ 120.00 $ 360.00 <br />FC Additional sidewalk milling 1 Is $ 306.00 $ 306.00 <br />Total Work Completed to Date: $ 22,402.50 <br />Less Previous Payments: $ 20,649.68 <br />Less Retainage @ 5 %: $ <br />Total Due This Payment: $ 1,752.83 <br />