Laserfiche WebLink
IP 09 -22 2009 Storni Sewer Projects <br />City of Ramsey <br />Pay Estimate No. <br />IP 09 - 22 2009 Storm Sewer Progects <br />BID ITEM <br />November 6, 2009 <br />A - Kamacite Street and 148"' Lane! Avenue <br />Al Mobilization 1 15 250.00 <br />A2 Traffic Control 1 Is 150_00 <br />A3 Connect Existing Storm 1 is 300.00 <br />A4 27 in round CB ind casting 1 ea 900.00 <br />A5 48 in CBMH 2 ea 1,050.00 <br />A6 15 in HDPE pipe 256 It 17.50 <br />A7 Castings 3 ea .550.00 <br />AS Topsoil 90 cu yds 15.00 <br />A9 Sod _ 620 sq yd 3110 <br />Qty Of Ramsey <br />UNIT CONTRACT <br />QTY UNIT PRICE AMOUNT <br />$190 852.05 Total <br />$13,040.00 <br />250.00 <br />150.00 <br />300.00 <br />900 00 <br />2,100.00 <br />4,480.00 <br />1,650.00 <br />1.350.00 <br />1,860.00 <br />83.51 453,983.51 <br />This Pay Application Completed to Bate <br />Units EXTENSION Units EXTENSION <br />$ 10,297.50 310,29750 <br />1.00 25000 1.00 250 00 <br />1.00 150.00 1.00 150.00 <br />1.00 300.00 100 300.00 <br />1.00 500130 1.00 900.00 <br />2.00 2100.00 2.00 210000 <br />257.00 4497.50 257.00 4,497_50 <br />3.00 1650.00 3.00 1,55000 <br />30.00 450.00 3000 450.00 <br />0.00 0.00 0.00 0.00 <br />174th Avenue & Sodium Street $18,746.50 21,431.75 21,431.75 <br />81 Mobilization 1 3s 1,350.00 1,350_00 1.00 1.350.00 1.00 1.350.00 <br />132 Traffic Control 1 15 550.00 550.00 0.95 522 0. 95 522.50 <br />B3 Remove Bit Pavement 381 sq yd 3.00 1,143.00 461.00 1443.330 481.00 1443. <br />84 Remove Spiltway 1 1s 500.00 500.00 1.00 500.00 701 500.00 <br />85 Adjiust casting 1 ea 300. 300.00 1 .00 300.00 1.00 300.00 <br />86 Sawcut Bit. 110 tt 1.75 192.50 221.00 366.75 X1. 366.75 -- <br />87 Grading 1 Is 500.00 500.00 1.00 500.00 1.00 500.00 <br />88 13612 Concrete curb and gutter 144 8 26 50 3.816.00 165.00 4.37250 165 Oct 4.37250 <br />Page 2 of 5 <br />