Laserfiche WebLink
11 ADDITIONAL LABOR & EQU DEMENT TO REMOVE THE <br />CONCRETE AND OTHER GARBAGE BY MANHOLE "L" WE <br />HAULED IT OUT TO ELK RIVER LANDFILL 06/26/06 06/27/06 <br />OLD DUMP TRUCK • <br />NEW DUMP TRUCK <br />300 HITACHI EXCAVATOR <br />LABOR, EQUIP, MATERIAL MARK -UP 15% <br />approx. 5 loads were hauled to Elk River Landfill and charge to the city <br />Cost of Removal of Debris Exhibit B <br />5.00 FIR $ 82.00 5.00 <br />1.00 HR $ 87.00 1.00 <br />2.50 HR $ 178.00 2.50 <br />1.00 LS $ 141.30 1.00 <br />$ 410.00 <br />$ 87.00 <br />$ 445.00 <br />$ 141.30 <br />$ 1,083.30 <br />