Laserfiche WebLink
<br />CASE # <br /> <br />RESULTS FROM CUL-DE-SAC SNOW PLOWING RFP'S <br /> <br />By: Grant Riemer PW Streets Supervisor <br /> <br />Back ground: <br /> <br /> <br />to advertize for request <br />-de-sac routes. The <br />t effective than using <br />ks and was <br />the city <br /> <br />At the October 20th PW Committee meeting st <br />for proposals to include snow plowing services <br />purpose of the case was to see if an outside contra <br />on call temporary plow drivers. The RFP was poste <br />mailed to approximately twenty local contractors. <br />received eight proposals. <br /> <br />Of the eight bids received, the lowest bi <br />$49.00jhourjvehicle. The remaind of bids r <br />depending on vehicle used. Two bids recei <br />been able to complete the w ' time allo <br />contractor lacing our on call s <br /> <br />wage ($f . <br />tables) and' <br />cost of a norma. <br />$392.00jroute, per <br />contractor to see what <br /> <br /> <br />e the routes is based on several factors. Hourly <br />s ($26. ur based on figures from the MOot rental <br />20 gallon @ $2.83jgallon). Based on these numbers the <br />364.28. For Mr. Maloney the cost would be <br />ts being so close staff would like to explore the use of a <br />tages and disadvantages would be. <br /> <br />Recommendation: <br /> <br />Staff recommends the award of the cul-de-sac snowplowing contract to Kevin Maloney Construction for <br /> <br />the 2009-2010 <br /> <br />Action: <br /> <br />Motion staff to enter in to a contract with Kevin Maloney Construction for plowing two cul-de-sac routes <br /> <br />for the 2009-2010 snow season. <br /> <br />Reviewed by: <br />