Laserfiche WebLink
<br />!PROJE:IMELIN <br /> <br /> <br />--= <br /> <br />......................................................,............................................. <br />: PHASES : <br /> <br /> <br />1MJ = Proposed Meeting <br />* = Noteworthy Date <br /> <br />Project Assumptions <br /> <br />We have assumed the following for the fee proposed: <br />Proposed fee assumes a total construction budget of up to $100,000. <br />The City of Ramsey will provide accurate as-built drawings of the existing <br />construction in digital format. <br />Proposed fee does not include furniture, plumbing, HVAC, electrical, low <br />voltage, or fire protection design services. <br />Services include up to nine (9) on-site meetings. <br />All trades will be bid at one time with Mechanical/Electrical by Owner. <br />Project does not pursue a LEED"" rating. <br />Typical reimbursable expenses shall include travel, parking, graphiC <br />reproductions, postage and delivery services. <br />Physical and/or computer models are not included in our fee or reimbursable <br />expenses but are available as an optional additional service. <br /> <br />I 0 BENTZ / THOMPSON / RIETOW <br />