Laserfiche WebLink
<br />PAST EXPERIENCE <br /> <br />HOPKINS FACILITIES IMPROVEMENT PROJECT <br />HOPKINS, MINNESOTA <br /> <br /> <br />Collaborative Design Group was selected by the City of Hopkins to provide architectural <br />and engineering services for a comprehensive upgrade to city-owned facilities. The project <br />included site planning and selection, re-evaluation of the previous program, evaluation of <br />the existing buildings, development of several expansion options and building design. <br /> <br />It was determined that the best option for the Public Works building was to retain the <br />existing precast office and maintenance spaces, and replaced the older 1940's buildings <br />with a new precast concrete building expansion. The addition includes vehicle storage <br />space, carpentry/sign shops, water meter shop, garbage truck storage, materials storage, <br />restrooms and an elevator to the storage mezzanines. The scope of work also involved <br />renovating the existing lunch room, restrooms, storage and reception areas. The exterior <br />work included a new fuel island, salt storage, parking and covered materials storage <br />areas. <br /> <br />The new Hopkins Fire Station replaced an outdated station. The five-bay, 26,000 square <br />foot volunteer station includes training room, exercise area and office spaces for fire <br />department administration. <br /> <br />The Hopkins Police Department addition and renovation project fully updates an undersized <br />and inefficient space. A new reception area was added to the southwest corner of the <br />building. The remodeled existing building meets objectives for separate public, police and <br />inmate spaces. The new floor plan provides for better circulation, enlarged dispatch center <br />and evidence room, new training, meeting rooms, sally port, and additional interview <br />rooms. Additionally, the city's primary Emergency Operations Center was relocated to the <br />renovated space. <br /> <br /> <br /> <br />