Laserfiche WebLink
<br />Estimated Fee for Services <br />Fee Breakdown by Phase <br /> <br />Hourly Rates <br /> <br />Mohagen/Hansen <br />Architectural Group <br /> <br />Todd E. Mohagen, AlA, NCARB <br />$160.00 <br />Lyn A. Berglund, ASID, CID <br />$140.00 <br />Jennifer Kaplan, AlA <br />$125.00 <br />Catherine Sweetman <br />$68.00 <br /> <br />SourceGroup, LLC <br /> <br />Dave Link <br />$135.00 <br />Eric Gabrielson <br />. $100.00 <br /> <br />AVI Systems <br /> <br />Patrick Hart <br />$150.00 <br />Larry Langlois <br />$150.00 <br /> <br />Mohagen <br />Hansen <br />Architectural <br />Group <br /> <br /> <br />Our proposed fee has been based on the information gleaned during <br />the walk-thru of the space and review of the City of Ramsey's <br />Request for proposal. Our experience on projects similar in scope <br />and size has enabled us to develop a fee that we believe we can <br />meet given that the project scope does not change during the project <br />process. <br /> <br />Below are the fees associated with Architecture and Interior Design, <br />Cost Estimating and Audio Visual Consulting. We welcome to <br />opportunity to further detail these dollar amounts with you if <br />required. <br /> <br />Mohagen/Hansen Architectural Group <br /> <br />· Plannin~ Architecture and Interior Design <br /> <br />SourceGroup LLC <br /> <br />· Cost Estimating and Project Management <br /> <br />AVI Systems <br /> <br />· AudioNisual Equipment Consulting <br /> <br />$ 15,500.00 <br /> <br />$ 13,000.00 <br /> <br />$ 7,500.00 <br /> <br />SUBTOTAL <br /> <br />$ 36,000.00 <br /> <br />Estimated Reimbursable Expenses (4%) <br /> <br />$ 1,440.00 <br /> <br />$37,440.00 <br /> <br />TOTAL ESTIMATED FEE <br /> <br />City of Ramsey, MN · Municipal Center Remodel <br />