My WebLink
|
Help
|
About
|
Sign Out
Home
2010 - 2014
Ramsey
>
Finance
>
Capital Improvement Program
>
2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2010 3:10:58 PM
Creation date
1/6/2010 2:05:36 PM
Metadata
Fields
Template:
Finance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Capital Improvement Program 2010 thru 2014 <br />City of Ramsey, Minnesota Department . Park Improvements <br /> Contact . <br />Project~ . 06-P ARK-013 I Type Improvement <br /> Useful Life 20 Years <br />Project Name Peltzer Park Connections <br /> Category Park .Improvement <br /> priority nla <br /> <br /> I o a rOJec os: ;" <br />Description <br />Extending the access trail to the play equipmert - around the cuI de sac easterly to right-of-way on 148th lane. <br />The second connection, further to the east, would require acquisition of part of the lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cuI de sac of Gamet Street. <br />Justification -I .... <br />Two important trail opportunities exist relative to Peltzer Park.. The first is- immediately available, and consists of extending the access trail to the <br />play equipment - around the cuI de sac easterly to right-of-way on 148th lane. This provides residents of Regency Ponds more of a direct acces~ to <br />the park. <br />The second connection, further to the east, would require acquisition of part bfthe lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cuI de sacof Gamet Street, and thereby improve access to both Peltzer and Alpine Parks - as well as <br />provide a circuitous walking loop within these neighborhoods. (See also Savanna Trail bridge.) <br />Modest signage and improved landscape at Peltzer would be a benefit as well. . <br /> <br />T tiP . t C t $4- 000 <br /> <br />. Expenditures <br />Improvements Other than Build <br /> <br />Total <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br />45,000 <br />45.000 <br /> <br />Total <br />45,000 <br /> <br />45.000 <br /> <br />. <br /> <br />Funding Sources 2010 <br />Park Improvement Tru~t Fund <br /> <br />Total <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br />45,000 <br />45,000 <br /> <br />Total <br />45,000 <br /> <br />45,000 <br /> <br />.. <br /> <br />Revised 12/09 <br /> <br />124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.