Laserfiche WebLink
<br />Category ~roject# Priority 2010 2011 2012 2013 2014 Total <br />Wetland 656W Outlet 04-STRM-013 nla 90,000 90,000 <br />West Mississippi Outlet 04-STRM-014 nla 250,000 250,'000 . <br />Annual Drainage Enhancement 09-STRM-002 nla 50,000 50,000 50,000 50.000 50,000 250,000 <br />Brook View Park Erosion 09-STRM-003 ' nla 10,000 10,000 <br />Now &: Then ,Estates Street Reconstruction 09-STRM-006 ' ' nla 40,000 40,000 <br />Storm Water Utility Improvement Total 215,000 225,000 885,000 75,000 75,000 1,475,000 <br />IStreet Improvement ' I <br />Annual Street Reconstruction Program 04-STR-001 nla 470,000 490,000 510,000 530,000 550,000 2,550,000 <br />County Road #116 (Dysprosium Sl to CR #57) 04-STR-003 nla 100,000 600,000 700,000 <br />McKinley Street 04-STR-006 nla 1,250,000 ' 1,250,000 <br />North Highway 10 Frontage Road 04-STR-007 nla 440,000 440,000 <br />Now&: Then Estates Street Reconstruction 04-STR-00B nla 250,000 250,000 <br />RTC Phase 2 Streets, Segment 2 04-STR-012 nla 340,000 340,000 <br />RTC Armstrong Blvd (Bunker Lake Blvd to Hwy 1 D) , 04-STR-013 nla 1,BOO,OOO 1,800;000 <br />, ' RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) , 04-STR-014 nla 3,010,000 3,010,000 <br />SouthHighway 10 Frontage Road 04-STR-O 17 nfa 700.000 700,000 <br />Variolite Street (Alpine Dr. to Ramsey Town Ctr.) 04-STR-0 1 B nfa 700,000 1,000,000 1,700,000 <br />County Road 5fAlpine Drive Realignment 06-STR-002 nfa 1,750,000 1,750,000 <br />Single Road Access Areas 06-STR~003 nla 100,000 100,000 <br />Dysprosium Street OB-STR-001 nla 900,000 900,000 <br />Civic Center Drive Stre~tscape OB-STR-002 nla 240,000 240,000 <br />RTC Ph2 Streets-Bridge OB-STR-004 nla 1,300,000 1,300,000 <br />River Pines Lift Station Street Connection OB-STR-005 nfa 55,000 55.000 . <br />Alpine Drive Railroad Crossing 09-STR-001 nfa 100,000 1.00,000 <br />142ND COURT NVY 1 O-STR-OO 1 nfa 325,000 325,000 <br />Street Improvement Total 5,195,000 1,790,000 5,220,000 2,270,000 3,035,000 17,510,000 <br />IStreet Light Utility Improvement ~ <br />Priority 0 Street Lights 05-STL T -001 nla 15,000 15,000 15,000 15,000 15,000 75,000 <br />Street Light Utility Improvement Total 15,000 15,000 15,000 15,000 15,000 75,000 <br />, IWater Utility Improvement ~ <br />WM Looping: Alpine Dr. (CSAH 5 to Germanium St) 04-WTR-001 nfa 100,000 100,000 , <br />Renovate Pump House 2 04cWTR-004 nla 49,000 49,000 <br />Complete Pump House 3 04-WTR-005 nla 60,000 60,000 <br />RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-WTR-009 nla 225,000 225,000 <br />, South Highway 10 Frontage Road 04-WTR-015 nla 90,000 90,000 <br />Water Treatment Plant Construction 04-WTR-017 nfa 9,700,000 B,700,OOO 18,400,000 <br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-01B nfa 226,100 226,100 <br />1.5 MG Ground Storage Reservoi~ 05-WTR-004 nla 2,000,000 2,000,000 <br />.. Water Utility Security Improvements 06-WTR-002 nfa 21,000 21,000 <br />Well Reh,abilitation 07-WTR-001 nla 22,000 24,000 26,000 28,000 30,000 130,000 <br />River Pines Lift Station Water Connection 08-WTR-003 nla 20,000 20,000 . <br />Water Meter Replacement OB-WTR-004 nla 226,000 237,300 249,200 712,500 <br />Well House I Improvements 09-WTR-001 nla B,OOO 8,000 <br />Revised 12/09 <br />12 <br />