My WebLink
|
Help
|
About
|
Sign Out
Home
2010 - 2014
Ramsey
>
Finance
>
Capital Improvement Program
>
2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2010 3:10:58 PM
Creation date
1/6/2010 2:05:36 PM
Metadata
Fields
Template:
Finance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project # <br /> <br />04-STRM-005 <br /> <br />2010 thru 201.4 <br /> Department Stormwater Utility <br /> Contact Unassigned . <br /> Type Improvement <br /> Useful Life Unassigned <br />- . Category Storm Water Utility Improvem <br /> Priority nJa <br /> <br />Capital Improvement Program <br /> <br />City of Ramsey, Minnesota <br /> <br />PrQject Name County Ditch #43 Cleaning <br /> <br />Description I . <br /> <br />County Ditch #43 drains an area of the City known as District Forty Three which extends north roughly to 153rdAve and west to County Road <br />#57. It has been storm sewered through the FIintwood Hills and River's Bend subdivisions and flows into the wetlands in River's Bend Park. The <br />City will explorejoint powers agreement with the WMOto determine ifWMO can maintain the County ditch system. This project will also <br />enhance the portions of Protected Wetland north of Sunwood Drive. It is anticipated that the project will take place concurrent with the <br />development of the vacant pared located between Sunfish Lake Boulevard and County Ditch 43. <br /> <br />Justification I . <br /> <br />The extreme northern portion of Ditch #43 has long been overgrown with vegetation and its pathway is barely distinguishable. The catcq basin <br />outlets on 153rd Ave are frequently submerged and ,freeze closed in winter causing the street to flood and freeze. Recditching approximately 1600' <br />would serve to provide better drainage. This project will also fulfill a commitment made to the DNR during the construction of Sunwood Drive's <br />bridge over Wetland 114p to improve that wetland. <br /> <br />Total Project Cost: $l5~,000 <br /> <br />Expenditures 2010 <br />Improvements Other than Build <br />Total <br /> <br />2011 <br />150,000 <br />150,000 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total . <br />150,000 <br />150,000 <br /> <br />. <br /> <br />Furiding Sources 2010 <br />Storm Water Utility Fund <br /> <br />Total <br /> <br />2011 <br />150,000 <br />150,000 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />150,000 <br /> <br />150,000 <br /> <br />. <br /> <br />Revised 12/09 <br /> <br />216 <br />
The URL can be used to link to this page
Your browser does not support the video tag.