Laserfiche WebLink
<br />Capital Improvement Program <br /> <br />City of Ramsey, Minnesota <br /> <br />Project # <br /> <br />04-STR-017 <br /> <br />Project Name South Highway 10 Frontage Road <br /> <br />Description I <br />This project would consist ofroad and stonn sewer to develop a frontage road east of the existing Rivlyn Ave. NW and south ofHwy 10. <br /> <br />Total Project Cost: $700,000 <br /> <br />Total project costs including land, street, sewer, water and stonn sewer = $790,000 ... <br /> <br />Justification I <br /> <br />Highway 1 b has been' identified as a candidate for freeway standards. The need to provide iUtemate access has been identified as a goal in the <br />Highway 10 Corridor Plan. Addit~onall:y, the stann sewer runoff from this area directly discharges into the MississippiRiver with no treatment. <br />. This project would correct both of these conditions. . <br /> <br />Expenditures <br />Land Acq~isition <br />Other <br /> <br />-2010 <br /> <br />.2011 <br /> <br />2012 <br />400,000 <br />300,000 . <br /> <br />700,000 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />400,000 <br />300,000 <br /> <br />700,000 <br /> <br />Total <br /> <br />Funding Sources <br />To Be Determined <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br />700,000 <br /> <br />700,000 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />700,000 <br /> <br />700,000 <br /> <br />. <br /> <br />Total <br /> <br />. <br /> <br />Revised 12/09 <br /> <br />250 <br />