Laserfiche WebLink
<br />Capital Improvement Program <br /> <br />City of Ramsey, Minnesota <br /> <br />Project # <br /> <br />08-STR-OOl <br /> <br />Project Name Dysprosium Street <br /> <br />Description <br /> <br />Dysprosium Street between Bunker Lake Boulevard and Nowthen Boulevard was constructed in the mid 80's. It has been seal coated but not <br />overlaid. This . ro' ect includes reconstruction of the street to 38 feet wide with a sidewalk along the east side. <br /> <br />Justification <br /> <br />To!al Project .Cost: $900,000 <br /> <br />, The street is showing signs of wear and needs reconstruction; The pavement surface is 45 feet wide and can be narrowed without impacting users. <br /> <br />Expenditures <br /> <br />Improvements other than Build <br /> <br />Total <br /> <br />2010. <br />900,000 . <br /> <br />900,000 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />900,000 <br /> <br />900,000 <br /> <br />Funding Sources <br />MSA <br /> <br />-2010 <br />900,000 <br /> <br />Total 900,000 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />900,000 <br /> <br />900,000 <br /> <br />. <br /> <br />e. <br /> <br />Revised 12/09 <br /> <br />258 <br />