Laserfiche WebLink
<br />Capital Improvement Program <br />City of Ramsey, Minnesota <br /> <br />2010 thru 2014 <br /> <br />Department Water Utility . <br />Contact Unassigned <br /> <br />Project # <br /> <br />04-WTR-015 <br /> <br />Type Improvement <br />UsefufLife 50 Years <br />Category Water Utility Improvement <br />Priority nla <br /> <br />. <br /> <br />Project Name South Highway 10 Frontage Road <br /> <br />Description I Total Project Cost: $90, <br />This project would consist of 1,000 lineal feet ofwatermain and boring under Highway 10, and a watermain loop J;lrovided for residents south of <br />Highway 10. <br /> , <br />Total oroject costs including land, street, sewer, water and storm sewer = $790,000. - <br />Justification I . <br />Water improvements that would be required to encourage optimal development and redevelopment wLthin the area. Additionatly, the residents eaSt <br />of Tungsten (as well as the new development) would be on a dead end line. The looping of the watermain would benefit these individuals by <br />providing a more continuous flow of water and better fire protection. <br /> <br />000 <br /> <br />Expenditures 2010 <br />Building Cost/Construction <br /> <br />Total <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br />90,000' <br />90,000 <br /> <br />2014 <br /> <br />Total <br />90,000 <br /> <br />90,000 <br /> <br />. <br /> <br />Funding Sources <br />Water Utility Fund <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />2013 <br />90,000 <br /> <br />90,000 . <br /> <br />2014 <br /> <br />Total <br />90,000 <br /> <br />99,000 <br /> <br />Total <br /> <br />. <br /> <br />Revised 12/09 <br />288 <br />