Laserfiche WebLink
<br />Capital Improvement Program ' <br />City of Ramsey, Minnesota <br /> <br />Project # <br /> <br />08-BLDG-003 <br /> <br />Project Name Fiber Optic Installation-Fire 'Station <br /> <br />Description 1 Total Project Cost: $32,73~ <br />Install 'fiber optic cable between city hall and Fire Station 1 on Armstrong Blvd. <br />Justification 1 <br />This fiber project would connect the Fire Station 1 to city hall. <br />This will eliminate the need for the phone circuits that currently connect ~e two facilities. <br />The current cost ofthe Tl circuitfor this location is $3,600/year. <br />This will both decrease network down tinle and increase network speed ll1id efficiency. <br /> <br />, Expenditures 2010 <br />Improvements Other than Build <br /> <br />Total <br /> <br />2011 <br />32,738 <br /> <br />32.738 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />, Total <br />32,738 <br /> <br />32.738 <br /> <br />Funding Sources 2010 <br />Capital Equipment Certificates <br /> <br />Total <br /> <br />2011 <br />32,738 <br />32,738 <br /> <br />2012 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />32,738 <br /> <br />32.738 <br /> <br />. <br /> <br />. <br /> <br />Revised 12/09 <br />86 <br />