My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #03-30 - 08/12/2003
Ramsey
>
Public
>
Ordinances
>
2003
>
Ordinance - #03-30 - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:57:40 AM
Creation date
8/27/2003 3:47:18 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#03-30
Document Date
08/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application for the conditional use permit shall be made in writing to the Council on such form <br />as the Council may from time to time designate, and shall include the following information: <br /> <br /> a. Names and address of the applicant, operator and owner of the land. <br /> <br /> b. The purpose of the permit. <br /> <br /> c. The exact legal description and acreage of the property to be graded, mined <br /> or filled. <br /> <br /> d. The following maps of the entire work site and including all areas within <br /> 350 feet of the work site. All maps shall be drawn at a scale of 1 inch to 100 <br /> feet unless otherwise stated below: <br /> <br /> 1. Map 1 - Existing work site conditions to include: <br /> <br /> (a) contour map (2 foot intervals); <br /> <br /> (b) existing vegetation; <br /> <br /> (c) existing drainage and permanent water areas; <br /> (d) existing structures; and <br /> (e) existing wells. <br /> <br /> (f) water table elevations. <br /> <br /> 2. Map 2 - Proposed operations to include: <br /> <br /> (a) location of work sites to be graded, mined or filled showing <br /> elevations of each stage of proposed operations; <br /> <br /> (b) location of storage of mined materials, showing maximum height <br /> of storage deposits; <br /> <br /> (c) location of vehicle parking, and access roads; <br /> <br /> (d) location and description of erosion and sediment control <br /> structures; <br /> <br /> (e) location of any proposed dewatering operations. <br /> 3. Map 3 - End Use Plan to include: <br /> (a) <br /> <br />(b) <br /> <br />(c) <br /> <br />final grade of proposed work site showing elevations and contour <br />lines at two foot intervals; <br /> <br />location and species of vegetation to be planted; <br /> <br />phasing plan; and <br /> 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.