Laserfiche WebLink
<br />FC/CC# --.!:L 0 ")-. <br /> <br />AUTHORIZE PLANS, SPECIFICATIONS, AND BIDDING FOR LEASE SPACE <br />REMODEL IN THE RAMSEY MUNICIPAL CENTER <br />By: Jessica L. Hendricks, Management Intern <br /> <br />Background: <br /> <br />Staff has been meeting with the BKV Group and Anoka County to redesign the space that will <br />accommodate the Anoka County License Center and the new mid-sized conference room. BKV <br />Group has submitted a possible design for the conference room, which will include a small <br />kitchenette area. This is attached for Council consideration. <br /> <br />BKV has also submitted' construction cost estimates for both the License Center and the conference <br />room. These two estimates have been attached for Council review. The estimated cost for the <br />conference room and kitchenette area is $51,412. The License Center estimate is $74,196.97. The <br />City has agreed to contribute $25/SF to cover the construction costs of the License Center for a total <br />of $55,000. The difference between the estimate and the tenant improvement allowance is <br />- $19,196.97, which will be funded by the County. <br /> <br />As a part of the upcoming remodel, staff is recommending that the City Council consider replacing <br />the floor mats in the entryways of the Municipal Center. The current mats are not wearing well and <br />cause increased maintenance throughout the building due to shedding. With the increased traffic <br />from the License Center, these issues will likely be exacerbated. Staff has obtained a quote for the <br />installation of heavy duty flooring material that will not shed and that has a darker, variegated color. <br />The estimate to replace the mats is $7,852.00, which includes the cost of removing the existing <br />product. <br /> <br />The cost to the City for the proposed lease space remodel, mid-size conference room build-out, and <br />entry mat replacement is as follows: <br /> <br />· $55,000 <br />· $51,412 <br />· $7,852 <br /> <br />Anoka County License Center tenant improvements <br />Mid-size conference room build-out <br />Entry mat replacement <br /> <br />It is anticipated that the fmallease agreement document will be approved by the County Board the <br />morning of February 23, 2010. The lease approval will be on the City Council agenda that same <br />evening for approval. At the December 8th, 2009 City Council meeting, a request was made by <br />Council for more analysis of the costs of the County's occupancy versus the lease revenue that will <br />be gleaned by their occupancy. Staff has attached the projected lease revenue that is cited in the <br />lease document for Council reference. Staff does not intend to request additional maintenance staff <br />due to the County's occupancy as we are not addition additional office space, but rather reallocating <br />occupancy within the existing footprint of the building. As a part of the 2010 general fund budget, <br />staff included the purchase of a floor machine, which will assist with the maintenance of the slate <br />and vinyl floors in the lobby spaces in the municipal center as well as the lobby space of the lease <br />space. This additional equipment is anticipated to reduce the labor hours allocated to floor <br />maintenance throughout the building. It should be noted that the CAM contribution included in the <br />lease agreement with the County is intended to offset the maintenance costs associated with <br />cleaning materials and equipment, thus both the lease revenue and CAM contribution are included <br />in the 2010 general fund budget as revenue. In addition, for the initial lease period, the city reserves <br />