Laserfiche WebLink
3.8 Delivery of Materials: It shall be the Contractor's responsibility to assume all liability for equipment and <br />material delivered to the work areas. Inadvertent acceptance of delivery by any representative of The City of <br />Ramsey shall not constitute acceptance or responsibility for any of the materials and equipment. <br />3.9 Property Damage: Repair of property damage occurring from the performance of the work under this <br />Contract shall be the responsibility of the Contractor. Damaged property shall be restored to its original <br />condition or better. <br />101 Page <br />