Laserfiche WebLink
The parties to this Joint Powers Agreement (JPA) agree in principle that construction of County State <br />Aid Project No. 02- 716 -11 collectively referred to as the "Project" is in the best interest of the traveling <br />public and that the Preliminary Layout as shown in Exhibit "A" defines the preliminary design of the <br />Project. <br />It is agreed that the Exhibit "A" Layout dated October 27, 2009 has been reviewed and accepted by the <br />parties and is suitable for preparation of final construction documents. Any significant changes made <br />hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an <br />amendment to this JPA. These same changes will require a change in the cost share to include any <br />additional design engineering costs that may occur. <br />IMPROVEMENTS: <br />It is agreed by the parties that in 2011 CSAH 116 will be reconstructed to a 4 -lane section with concrete <br />median to the extent shown in "Exhibit A ". Improvements' include but'are not limited to traffic signals, <br />right and left turn lanes, thru lanes, curb & gutter, storm sewer with associated ponding, bituminous trail <br />and potential noisewalls upon the findings of the noise study. ` s <br />INTERSECTIONS: <br />.` <br />As agreed by the parties, improvements to the following int have been incorporated in the <br />Exhibit "A" Layout design: <br />CSAH 116 / Basalt: Full Access with this project (subject to change inyfuture projects) <br />CSAH 116 / Azurite Street Streek$StfUllAccess with this project will be`'Right In / Right Out in future). <br />CSAH 116 / CSAH 57: Mill Access Intersection with Traffic Sign;` <br />CSAH 116 / Wolfram Street NW Right In / Right Out <br />W <br />CSAH 116 / Unity Street N, Right Iii %Right Out. <br />CSAH 116 /Tungsten Street NV Rrgl tit Right Ou <br />CSAH 116 / ugnesrum Street NW Full Access (Under - ground work for signal will be placed with this <br />project.) <br />CSAH 116 /'Krypton Street NW Right In / Right Out <br />CSAH 116 / Iodme Street NW: Right In/ Right Out (To be closed if future crash issues. arise). <br />CSAH 116 / Germanium Street NWi..Right In / Right Out <br />TRAFFIC SIGNAL: <br />The parties agree that a traffic signal system at the CSAH 116 and CSAH 57 intersection will be <br />constructed with this project. <br />CSAH 116 and CSAH 57 Signal System: <br />The parties agree that the cost of the construction of this signal will be paid for by federal dollars with <br />100% of the local match to be paid by the City. Following the construction, the ongoing traffic signal <br />maintenance of the CSAH 116 and CSAH 57 signal system will be consistent with Anoka County <br />warranted traffic signal maintenance practices, with the County 100% responsible for all ongoing traffic <br />signal maintenance, the City reimbursing the County 100% for all ongoing EVP maintenance (billed <br />quarterly on an ongoing basis), the City 100% responsible for all luminaire maintenance, and the City <br />100% responsible for the ongoing supply of electrical power for the traffic signal system. <br />