Laserfiche WebLink
c. Public streets with concrete curb and gutter <br />d. Trunk and lateral storm drainage facilities <br />e. Sidewalk Construction along Sunwood Drive and Sapphire St. <br />f. Natural gas <br />g. Telephone service <br />h. Electric service <br />i. Temporary and permanent erosion control <br />j. Street lights (installment arranged by the CITY during Stage I Improvements and <br />paid for by DEVELOPER as Stage II Improvement) <br />("Stage I Improvements") <br />The DEVELOPER agrees to construct the Stage I Improvements according to the terms <br />and conditions of this Contract and in accordance with plans submitted to the CITY. Said plans <br />shall be in conformance with the Final Plat and Final Engineering Plans dated March 22, 2010 as <br />amended by staff review. All of the plans are subject to revisions per City Staff Review Letter <br />dated April 21, 2010 The final construction plan for the Stage I Improvements shall be <br />submitted to the CITY Engineer for review and approval prior to commencement of <br />construction. <br />The DEVELOPER agrees to provide specifications, subject to review and approval of <br />the City Engineer, for construction and restoration of utilities within Sunwood Drive. Work <br />must be completed under traffic, be brought up to grade, and must be restored to existing <br />conditions within 24 hours. <br />The DEVELOPER shall be responsible for completing the rough grading and providing <br />lot corner stakes prior to the installation of underground utilities. <br />6. Sta eg I Improvement Financial Guarantee. The DEVELOPER shall provide a <br />financial guarantee to the CITY guaranteeing the construction of the Stage I Improvements and <br />their timely completion. The DEVELOPER shall be responsible for a financial guarantee in the <br />amount of Dollars and No Cents ($ .00), which amount is <br />125% of the CITY Engineer's estimated cost of the Stage I Improvements. The financial <br />guarantee shall be deposited with the CITY at the time of execution of this Contract. Upon <br />completion of Stage I Improvements (including the removal of "temporary" erosion control <br />measures as identified in the approved Grading Plan), acceptance by the CITY, supported by <br />appropriate lien waivers, The DEVELOPER may request a reduction in the amount of the <br />financial guarantee, but only if the maintenance guarantee required by Paragraph 8 below has <br />been deposited. <br />7. Inspection Fees. The DEVELOPER shall be responsible for all inspection costs <br />incurred by the CITY related to the installation of Stage I Improvements. The DEVELOPER <br />shall make a cash deposit into the appropriate escrow account at the CITY and the CITY shall <br />have the authority to draw upon these funds for the purpose of compensating for inspection <br />services. The amount of the deposit shall be equal to five percent (5%) of the estimated cost of <br />the Stage I Improvements. The DEVELOPER shall be responsible for a cash deposit in the <br />Ramsey Town Center 14th Addition <br />Development Contract <br />Page 2 of 10 Pages <br />