Laserfiche WebLink
Allina Health System: Preliminary Site Plan Review <br />April 2l, 2010 <br />Page S of S <br />The roof drain connection from the building is shown as 15", the pipe downstream from catch basin <br />K is shown as 12". Please provide detailed calculations for the storm sewer system. <br />The City of Ramsey uses a modified Class 5 gradation for street paving. The patch material for <br />Sunwood drive must meet this gradation standard. <br />REU Number: This property will be subject to a storm water utility charge. The quarterly charge is <br />dependent upon the number Residential Equivalent Units (REU) calculated for this property. The <br />REU will .be calculated at the time of final plat review. <br />All comments from the Staff Review Letter dated February 24, 2010 in relation to the Minor Plat <br />request from PSD, LLC are hereby incorporated as reference and is available upon request. <br />The City Council will be meeting at 7:00 pm on Tuesday, April 27, 2010 at the Ramsey Municipal <br />Center at 7550 Sunwood Drive to review your final site plan. You, or your representative, should be <br />present at the meeting to answer any questions that may arise. <br />If you have any questions, please call our office at (763) 427-1410 <br />Sincerely, <br />CITY OF RAMSEY <br />Tim Gladhill <br />Associate P1 er ' <br />~~ <br />Len Linton <br />Civil Engineer <br />CC: Patrick Giordana, AIA, LEEP AP . <br />BDH & Young <br />7001 France Ave South, Suite 200 <br />Edina, MN 55435 <br />Ryan Bluhm, P.E., LEEP AP <br />Clark Engineering Corporation <br />621 Lilac Drive N. <br />Minneapolis, MN 55422-4609 <br />