My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 04/27/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:35:41 PM
Creation date
4/22/2010 3:20:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completion of the construction of the Required Improvements shall be made by the City Council after <br />consultation with the City Engineer. In the event the Permittee fails to construct and install the <br />Required Improvements as required herein, the City Council may order the completion of the <br />Required Improvements with City day labor and/or by letting contracts for said completion and draw <br />upon the escrow for payment. Only the City Council shall have the authority to direct completion of <br />the Required Improvements and withdraw from the escrow account. The Permittee hereby grants <br />permission and a license to the City and/or its contractors and assigns to enter upon the Site for the <br />purpose of completing the construction and installation of the Required Improvements in the event of <br />the Permittee's default. <br />10. Inspection Fees. The Permittee shall be responsible for all inspection costs incurred by the City <br />related to the installation of Required Improvements. The Permittee shall make a cash deposit into <br />the appropriate escrow account at the City and the City shall have the authority to draw upon these <br />funds for the purpose of compensating for inspection services. The amount of the deposit shall be <br />equal to five percent (5%) of the estimated cost of the Required Improvements, which equates to <br />Dollars and No Cents ($ ) (5% x $ ). Upon <br />completion of the Improvements to the satisfaction of the City, any surplus balance remaining in the <br />City's escrow account shall be refunded to the Permittee. <br />SECTION II <br />PERMITS AND OCCUPANCY <br />11. Requirements for Building Permits. No building permit for any lot on the Subject Property shall <br />be issued until: (a) a Class 5 driving surface is installed to within 300 feet of the structure; (b) site <br />plan approval is granted by the City and any expense incurred in giving site plan approval has been <br />reimbursed to the City; (c) the Building Official has been provided with a copy of the approved site <br />plan, signed by a registered architect or surveyor, showing all dimensions to scale; (d) the Plat has <br />been recorded at Anoka County Property Records, (e) a Lower Rum River Watershed Management <br />Organization Permit has been obtained. In addition, the City reserves the right to suspend all <br />building activities upon the City being notified by an outside agency that the appropriate permit(s) <br />was not obtained from the applicable agency. Approval of the building foundation requires a <br />certificate of elevation signed by a licensed (State of Minnesota), professional land surveyor, <br />verifying that the elevation with the approved grading plan for the Subject Property. Foundation <br />approvals will require a certificate of elevation verifying that the actual elevation is in compliance <br />with the approved grading and drainage plan. The lowest floor elevation shall be at least 2 feet <br />above the 100 year elevation. <br />No occupancy permit for any lot in the Subject Property shall be issued until: (a) vehicular access <br />to the Subject Property is provided including the installation of at least one layer of bituminous <br />surfacing; (b) all utilities are in place, operational and accepted by the City; (c) slope of less than <br />2%, a certificate of grading, prepared by a licensed (State of Minnesota), professional land surveyor, <br />must be provided to the City documenting that the flattest grade on this lot is 1% or greater will <br />require certificates of grading. <br />Allina Health System Medical Office and Clinic <br />Development Permit <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.