My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 04/27/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:35:41 PM
Creation date
4/22/2010 3:20:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br />CONSIDER AWARD OF CONTRACT FOR CITY PROJECT #08-33, <br />THE BITUMINOUS PAVING OF UTE STREET NORTH OF 179TH LANE <br />By Steve Jankowski, Assistant City Engineer <br />Background: <br />On May 27, 2008 a petition was received by City Council requesting the bituminous paving of <br />Ute Street from 179 Lane to a distance approximately 800 feet to the north (terminating at the <br />dead ertd turn around). Following several informational meeting with the project residents and <br />the Public Works Committee during the fall of 2008 and early 2009 the scope of the project <br />improvements were defined. A public hearing was held on this project on April 14, 2009 and the <br />City Council authorized the project on May 26, 2009. Right of way acquisition proceeded <br />through the fall of 2009 and early 2010. Plans were approved and authorized for bidding by the <br />City Council. <br />Recall that the basic project was fora 24 foot wide roadway with a bituminous berm curb. It was <br />directed that an alternate proposal be solicited for a concrete curb and gutter in lieu of the <br />bituminous berm curb. Bids were received from six bidders on Tuesday April 20, 2010. A <br />summary of the bids received is presented below: <br /> Base Alternate <br />Contractor City Bid Bid <br />Rum River Contracting Co. Princeton, Mn $ 128,524.14 $ 138,700.01 <br />Omann Brothers Paving Inc. Albertville, Mn $ 126,727.62 $ 138,849.12 <br />Douglas-Kerr Underground Inc. Mora , Mn $ 134,071.87 $ 144,001.89 <br />North Valley Inc Nowthen, Mn $ 133,444.03 $ 144,808.13 <br />Northwest Asphalt Inc. Shakopee, Mn $ 150,711.51 $ 161,240.76 <br />Dryden Excavating Anoka, Mn $ 153,885.50 $ 163,502.00 <br />Feasibility Study Estimate $ 127,469.00 $ 142;959.00 <br />The low bids received are within one to three percent of the construction cost estimate provided <br />in the feasibility study. It should be noted that the lowest bid Contractor is different depending <br />on whether the base or alternate project is selected. <br />Staff Recommendation: <br />Staff recommends that the City Council award a contract for City Project #08-33, Bituminous <br />Paving of Ute Street North of 179`h Lane to Rum River Contracting, Inc. in the amount of <br />$144,808.13 for the alternate project which includes concrete curb and gutter. The alternate <br />project which includes concrete curb and gutter is anticipated to have a longer service life than <br />the basic project. This fact is significant in this location which is not foreseen to have municipal <br />utilities for an extended period of time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.