My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/08/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 04/08/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:47:27 PM
Creation date
8/29/2003 11:12:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/08/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-290- <br /> <br />eligible for funding by the City. Source of City funding shall not be a <br />determinate of financial participation. <br /> <br />Installation by City. All Stage I improvements shall be planned, designed,. <br />inspected and/or approved by the City Engineer. The administrative charges <br />of the City in connection with such improvements shall be included in the <br />costs determined in Subdivision 3 of this Section. <br /> <br />c. Minimum Escrow Requirements for Stage I Improvements. For City <br /> awarded improvements, the owner or subdivider shall provide a financial <br /> surew in a form acceptable to the City make a cash <br /> Finanee-Depam~em4-in a minimum amount equal to 15% 20% of the City <br /> Engineer's estimated cost of installing the Stage I Development <br /> improvements described in ~9.50.50 Subd. 3b abo~e. <br /> <br /> ~proved- by the City i-n-~m~n-~mum~m~}.~t-eq, ual-m-2 <br /> <br />For non-City awarded improvements, the owner or subdivider shall provide <br />a financial surety in a form acceptable to the City. <br /> ~w ........... ~ ...... mn~a'~~r of credit equal to 125% of the <br />total cost of such .improvements as estimated by the City Engineer, <br />including the billable estimated expense of the City for engineering, legal, <br />fiscal, administrative ~d other expenses incm~ed by the City in co~ection <br />with the making of such imprOvements, en.-aqam~th-~-sis as th~~. <br /> <br />~~ Upon total completion of Stage I Improvements (includ~nR the <br />removal of "temporary" erosion conrail measm'es), acceptance by the City, <br />supported by appropriate lien waivers, the Developer-may request a <br />reduction in the mnount of the financial guar~tee, but only if the <br />mgintenance gm~antee required has been deposited. <br /> <br />There shall be an escrow Devel. opnnent aA. greement which shall provide that <br />in the event the required improvements are not completed within the <br />specified 'timeline one ye~, all amounts held made~ in the escrow <br />Development Atzreement aemement ~'~'~" ma?' be <br />and d'el;~;",~re,-3 to the City-drawn upon bv the City and applied by the City to <br />the cost of completing the required improvements. If the funds available <br />within said escrow are not sufficient to complete the required improvements, <br />the necessm'y additional cost to the City shall be assessed against the <br />subdivision. Any balance remaining in the escrow fund after such <br /> <br />9.50 Subdivision Regulations <br /> <br />9-57 <br /> <br />March 2003 Draft <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.