My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/08/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 04/08/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:47:27 PM
Creation date
8/29/2003 11:12:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/08/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATE ON FEASIBILITY STUDY FOR THE <br />IMPROVEMENT OF UNPAVED STREET' <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Pw cxss <br /> <br />Background: <br /> <br />Staffwas directed last fall to prepare a feasibility study addressing how gravel and dirt <br />streets might be upgraded. Direction to Staffwas to consider a program for non paved <br />streets, similar to that in place for paved roadways, specifically that the City pay half the <br />cost of preventative maintenance <br /> <br />The purpose of this:case is to review the current status of the preparation of this study, <br />and to"solicitate direction on several policy issues that will be needed to be defined before <br />the financing section of the study can be completed. <br /> <br />Attached to this case is a draft of the portions of the study which describes the City's <br />current unpaved street inventory. Several roadways are proposed to be eliminated from <br />consideration for this study for the reasons described. The study anticipates the <br />possibility of twelve separate projects, and at this t/me a discussion of existing conditions <br />and proposed improvements has been prepared for half of them. <br /> <br />The Committee will note that two separate levels of improvements have been proposed <br />for each project. Alternative A brings the roadway to a well-drained gravel surface <br />which is capable of being maintained with dust control and periodic grading. Alternative <br />B goes an additional step beyond, with the addition of bituminous surfacing. Having <br />these two levels of improvement was the specific direction of the Council last fall. <br /> <br />The financing section of this report is still to be completed. There will be significant <br />costs associated with grading, placement of Class 5, and installation of driveway culverts. <br />In the past when unpaved roadways were hard surfaced, these costs were fudly assessed.. <br />Unless there is a desire to provide an addition financial incentive for paving th~se <br />remaining streets, these' costs should be fully assessed to remain consistent with past <br />practices. <br /> <br />It will also be necessary to define the elements ofperiodic or preventative maintenance, <br />which would be partially financed by the City and part/ally assessed. Staffproposes: that. <br />these elements include monthly grading, annual treatment with calcium chloride to <br />control dust, and the addition of Class 5 after five years. <br /> <br />For alternative A, it is. proposed that the construction costs and 50 percent of the . <br />maintenance costs for the first four years would be assessed if the project was apprOVed. <br />Subsequently, in every fi~'th year, an assessment would be proposed for 50 percent of the <br />cost of adding gavel and maintenance for the next five years. <br /> <br />-34'~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.