My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/11/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 05/11/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:36:56 PM
Creation date
5/6/2010 11:47:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # ~ , ~ ~ <br />CONSIDER AUTHORIZATION OF IMPROVEMENT PROJECT #09-25 <br />DYSPROSIUM STREET IMPROVEMENTS <br />B.y: Steven J. Jankowski, Assistant City Engineer <br />Background: <br />This project was initiated at the direction of City Council and has involved the Council and its <br />Public Works Committee beginning in April of 2009. Below is a summary of the project <br />chronology: <br /> <br />Date Mtg <br />T e <br />Meetin Action <br />4/21/09 PW Discussed sco e of im rovements desired in Flintwood neighborhood <br />8/19/09 PW Directed scope of feasibilit study <br />9/8/09 CC Ratify direction of PW committee <br />12/08/09 CCWS Assessment olicy discussed <br />2/9/10 CC Receive feasibili stud and set date for a public hearing <br />3/2/10 Public Neighborhood informational meeting held <br />3/9/10 CC Council hold ublic heazin on project <br />4/20/10 PW Committee considers PH comments and recommends feasibility study <br />modifications <br />4/27/10 CC Ratifies feasibility study modifications recommended by PW Committee <br />The current scope of the improvements associated with this project is contained in the attached <br />feasibility study. Because a portion of the project cost is proposed to be special assessed, a <br />waiting period of 60 days beyond the date of the public hearing must elapse as specified by <br />Section 4.60.05 Sub.l of City Code prior to the Council ordering this project. This period <br />expired on May 9, 2010.. <br />Attachments <br />• Resolution 10-OS-XXX ordering IP 09-25 Dysprosium Street Improvements <br />• IP 09-25 Feasibility Study Revised Apri12010 <br />Financing: <br />The total project cost which includes new curb and gutter and pavement, sidewalk, storm sewer <br />replacement and expansion, street lights and boulevazd trees is estimated to be $672,911. The <br />City will fund $573,462 of this cost from its Municipal State Aid (MSA) account. The remaining <br />$99,449 shall be funded through special assessments to property owners with frontage along the <br />street consistent with previous Council direction. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.